US Bridges

Ir 90 WB over Ir 90WB over E9th St.

Good

Cuyahoga County, Ohio · Ir 90 over E9th · Structure no. 1809687

Built
2012
13 years old
Condition
Good
inspected December 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
140 ft
1 main span
Daily traffic
54,900
2012 count
Owner
State
State Highway Agency

About this bridge

Ir 90 WB over Ir 90WB over E9th St. is a prestressed concrete stringer/multi-beam or girder carrying Ir 90 WB over Ir 90WB over E9th St. in Cuyahoga County, Ohio. It was built in 2012, so it is 13 years old, younger than the Ohio average of 47.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 54,900 vehicles a day, roughly 8% of them trucks, projected to reach 76,201 by 2032. The structure is 140 ft (42.7 m) long and 87 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesIr 90 WB
CrossesIr 90WB over E9th St.
LocationIr 90 over E9th
StateOhio
Coordinates41.4948, -81.68221
Functional classUrban Principal Arterial - Interstate

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure9 ExcellentNo problems noted.
Last inspectionDecember 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation8: Equal to present desirable criteria
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating46.4 US tons
Inventory rating35.7 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans1
Design loadHL 93
Structure length140 ft (42.7 m)
Longest span138 ft (42.2 m)
Deck width87 ft (26.5 m)
Roadway width81 ft (24.8 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic54,900 (2012)
Projected traffic76,201 by 2032
Trucks8%
Lanes on structure4
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Ir 90 WB over Ir 90WB over E9th St. built?

It was built in 2012, making it 13 years old in 2025.

What condition is Ir 90 WB over Ir 90WB over E9th St. in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in December 2023.

How much traffic does Ir 90 WB over Ir 90WB over E9th St. carry?

About 54,900 vehicles per day (2012 count), of which roughly 8% are trucks.

How long is Ir 90 WB over Ir 90WB over E9th St.?

The structure is 140 ft (42.7 m) long with a longest span of 138 ft (42.2 m) and a deck 87 ft wide.

Who owns Ir 90 WB over Ir 90WB over E9th St.?

It is owned by the State Highway Agency.