US Bridges

Ir 90 EB over Ir 90EB over E9th St.

Good

Cuyahoga County, Ohio · IR-90 over E9th · Structure no. 1808893

Built
2016
9 years old
Condition
Good
inspected December 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
137 ft
1 main span
Daily traffic
45,000
2015 count
Owner
State
State Highway Agency

About this bridge

Ir 90 EB over Ir 90EB over E9th St. is a prestressed concrete stringer/multi-beam or girder carrying Ir 90 EB over Ir 90EB over E9th St. in Cuyahoga County, Ohio. It was built in 2016, so it is 9 years old, younger than the Ohio average of 47.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 45,000 vehicles a day, roughly 8% of them trucks, projected to reach 48,000 by 2035. The structure is 137 ft (41.9 m) long and 75 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesIr 90 EB
CrossesIr 90EB over E9th St.
LocationIR-90 over E9th
RouteInterstate 90
StateOhio
Coordinates41.49462, -81.68168
Functional classUrban Principal Arterial - Interstate

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure9 ExcellentNo problems noted.
Last inspectionDecember 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation8: Equal to present desirable criteria
Deck geometry7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating53.6 US tons
Inventory rating42.9 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans1
Design loadHL 93
Structure length137 ft (41.9 m)
Longest span137 ft (41.9 m)
Deck width75 ft (22.9 m)
Roadway width72 ft (21.9 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic45,000 (2015)
Projected traffic48,000 by 2035
Trucks8%
Lanes on structure4
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Ir 90 EB over Ir 90EB over E9th St. built?

It was built in 2016, making it 9 years old in 2025.

What condition is Ir 90 EB over Ir 90EB over E9th St. in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in December 2023.

How much traffic does Ir 90 EB over Ir 90EB over E9th St. carry?

About 45,000 vehicles per day (2015 count), of which roughly 8% are trucks.

How long is Ir 90 EB over Ir 90EB over E9th St.?

The structure is 137 ft (41.9 m) long with a longest span of 137 ft (41.9 m) and a deck 75 ft wide.

Who owns Ir 90 EB over Ir 90EB over E9th St.?

It is owned by the State Highway Agency.