IR90-EB over Josly over Joslyn RD NS RTA84
FairCuyahoga County, Ohio · 1.95 MI E of JCT SR237 · Structure no. 1808206
- Built
- 1977
- 48 years old
- Condition
- Fair
- inspected July 2024
- Type
- Stringer/Multi-beam or Girder
- Steel Continuous
- Length
- 660 ft
- 6 main spans
- Daily traffic
- 57,557
- 2015 count
- Owner
- State
- State Highway Agency
About this bridge
IR90-EB over Josly over Joslyn RD NS RTA84 is a steel continuous stringer/multi-beam or girder carrying IR90-EB over Josly over Joslyn RD NS RTA84 in Cuyahoga County, Ohio. It was built in 1977, so it is 48 years old, older than the Ohio average of 47.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 57,557 vehicles a day, roughly 5% of them trucks, projected to reach 79,889 by 2035. The structure is 660 ft (201.2 m) long and 74 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was IR90-EB over Josly over Joslyn RD NS RTA84 built?
It was built in 1977, making it 48 years old in 2025.
What condition is IR90-EB over Josly over Joslyn RD NS RTA84 in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in July 2024.
How much traffic does IR90-EB over Josly over Joslyn RD NS RTA84 carry?
About 57,557 vehicles per day (2015 count), of which roughly 5% are trucks.
How long is IR90-EB over Josly over Joslyn RD NS RTA84?
The structure is 660 ft (201.2 m) long with a longest span of 120 ft (36.6 m) and a deck 74 ft wide.
Who owns IR90-EB over Josly over Joslyn RD NS RTA84?
It is owned by the State Highway Agency.