CR-118 Crocker RD over Ir 90
GoodCuyahoga County, Ohio · .3 Mi. N. of Jct. SR 254 · Structure no. 1807722
- Built
- 1972
- 53 years old, rebuilt 2000
- Condition
- Good
- inspected July 2024
- Type
- Stringer/Multi-beam or Girder
- Steel Continuous
- Length
- 296 ft
- 4 main spans
- Daily traffic
- 9,242
- 2015 count
- Owner
- State
- State Highway Agency
About this bridge
CR-118 Crocker RD over Ir 90 is a steel continuous stringer/multi-beam or girder carrying CR-118 Crocker RD over Ir 90 in Cuyahoga County, Ohio. It was built in 1972 and reconstructed in 2000, so it is 53 years old, older than the Ohio average of 47.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 9,242 vehicles a day, roughly 7% of them trucks, projected to reach 12,828 by 2035. The structure is 296 ft (90.2 m) long and 76 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was CR-118 Crocker RD over Ir 90 built?
It was built in 1972, making it 53 years old in 2025. It was reconstructed in 2000.
What condition is CR-118 Crocker RD over Ir 90 in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in July 2024.
How much traffic does CR-118 Crocker RD over Ir 90 carry?
About 9,242 vehicles per day (2015 count), of which roughly 7% are trucks.
How long is CR-118 Crocker RD over Ir 90?
The structure is 296 ft (90.2 m) long with a longest span of 82 ft (25 m) and a deck 76 ft wide.
Who owns CR-118 Crocker RD over Ir 90?
It is owned by the State Highway Agency.