US Bridges

Ir 90-WB over CR 60 (bradley Rd)

Good

Cuyahoga County, Ohio · .5 Mi. W. Basset RD Inter · Structure no. 1807692

Built
1971
54 years old, rebuilt 2002
Condition
Good
inspected March 2023
Type
Stringer/Multi-beam or Girder
Steel Continuous
Length
157 ft
3 main spans
Daily traffic
37,655
2015 count
Owner
State
State Highway Agency

About this bridge

Ir 90-WB over CR 60 (bradley Rd) is a steel continuous stringer/multi-beam or girder carrying Ir 90-WB over CR 60 (bradley Rd) in Cuyahoga County, Ohio. It was built in 1971 and reconstructed in 2002, so it is 54 years old, older than the Ohio average of 47.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 37,655 vehicles a day, roughly 5% of them trucks, projected to reach 52,265 by 2035. The structure is 157 ft (47.9 m) long and 66 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesIr 90-WB
CrossesCR 60 (bradley Rd)
Location.5 Mi. W. Basset RD Inter
RouteInterstate 90
StateOhio
Coordinates41.46877, -81.96043
Functional classUrban Principal Arterial - Interstate

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionMarch 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating63.2 US tons
Inventory rating48.9 US tons

Structure

MaterialSteel Continuous
DeckConcrete, cast-in-place
Main spans3
Design loadHS 20 + Mod
Structure length157 ft (47.9 m)
Longest span64 ft (19.4 m)
Deck width66 ft (20 m)
Roadway width63 ft (19.1 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic37,655 (2015)
Projected traffic52,265 by 2035
Trucks5%
Lanes on structure3
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Ir 90-WB over CR 60 (bradley Rd) built?

It was built in 1971, making it 54 years old in 2025. It was reconstructed in 2002.

What condition is Ir 90-WB over CR 60 (bradley Rd) in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in March 2023.

How much traffic does Ir 90-WB over CR 60 (bradley Rd) carry?

About 37,655 vehicles per day (2015 count), of which roughly 5% are trucks.

How long is Ir 90-WB over CR 60 (bradley Rd)?

The structure is 157 ft (47.9 m) long with a longest span of 64 ft (19.4 m) and a deck 66 ft wide.

Who owns Ir 90-WB over CR 60 (bradley Rd)?

It is owned by the State Highway Agency.