US Bridges

Bukeye/Shakr/Woodh over RTA105 at Woodhill Road

Good

Cuyahoga County, Ohio · 2.08 MI East of SR 8 · Structure no. 1807439

Built
2015
10 years old
Condition
Good
inspected December 2023
Type
Stringer/Multi-beam or Girder
Steel
Length
68 ft
1 main span
Daily traffic
13,967
2015 count
Owner
State
State Highway Agency

About this bridge

Bukeye/Shakr/Woodh over RTA105 at Woodhill Road is a steel stringer/multi-beam or girder carrying Bukeye/Shakr/Woodh over RTA105 at Woodhill Road in Cuyahoga County, Ohio. It was built in 2015, so it is 10 years old, younger than the Ohio average of 47.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 13,967 vehicles a day, roughly 3% of them trucks, projected to reach 140 by 2035. The structure is 68 ft (20.8 m) long and 182 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesBukeye/Shakr/Woodh
CrossesRTA105 at Woodhill Road
Location2.08 MI East of SR 8
RouteState Highway 87
StateOhio
Coordinates41.48277, -81.61805
Functional classUrban Other Principal Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck9 ExcellentNo problems noted.
Superstructure9 ExcellentNo problems noted.
Substructure8 Very GoodNo problems noted.
Last inspectionDecember 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation8: Equal to present desirable criteria
Deck geometry2: Basically intolerable, requiring high priority of replacement
Approach roadway alignment6: Equal to present minimum criteria
Operating rating75 US tons
Inventory rating46.4 US tons

Structure

MaterialSteel
DeckConcrete, cast-in-place
Main spans1
Design loadHS 25 or greater
Structure length68 ft (20.8 m)
Longest span58 ft (17.7 m)
Deck width182 ft (55.5 m)
Roadway width57 ft (17.4 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic13,967 (2015)
Projected traffic140 by 2035
Trucks3%
Lanes on structure5
Traffic directionTwo-way traffic
CarriesHighway
CrossesRailroad
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Bukeye/Shakr/Woodh over RTA105 at Woodhill Road built?

It was built in 2015, making it 10 years old in 2025.

What condition is Bukeye/Shakr/Woodh over RTA105 at Woodhill Road in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in December 2023.

How much traffic does Bukeye/Shakr/Woodh over RTA105 at Woodhill Road carry?

About 13,967 vehicles per day (2015 count), of which roughly 3% are trucks.

How long is Bukeye/Shakr/Woodh over RTA105 at Woodhill Road?

The structure is 68 ft (20.8 m) long with a longest span of 58 ft (17.7 m) and a deck 182 ft wide.

Who owns Bukeye/Shakr/Woodh over RTA105 at Woodhill Road?

It is owned by the State Highway Agency.