US Bridges

I275 SB over CR 61(HOPPER Hill Road)

Good

Clermont County, Ohio · .5 MI S of SR125 · Structure no. 1305867

Built
1972
53 years old, rebuilt 2003
Condition
Good
inspected February 2024
Type
Stringer/Multi-beam or Girder
Steel Continuous
Length
145 ft
3 main spans
Daily traffic
16,463
2015 count
Owner
State
State Highway Agency

About this bridge

I275 SB over CR 61(HOPPER Hill Road) is a steel continuous stringer/multi-beam or girder carrying I275 SB over CR 61(HOPPER Hill Road) in Clermont County, Ohio. It was built in 1972 and reconstructed in 2003, so it is 53 years old, older than the Ohio average of 47.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 16,463 vehicles a day, roughly 5% of them trucks, projected to reach 22,851 by 2035. The structure is 145 ft (44.3 m) long and 65 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesI275 SB
CrossesCR 61(HOPPER Hill Road)
Location.5 MI S of SR125
RouteInterstate 275
StateOhio
Coordinates39.0645, -84.30686
Functional classUrban Principal Arterial - Interstate

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Last inspectionFebruary 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation8: Equal to present desirable criteria
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment9: Superior to present desirable criteria
Operating rating78.3 US tons
Inventory rating60.4 US tons

Structure

MaterialSteel Continuous
DeckConcrete, cast-in-place
Main spans3
Design loadHS 20 + Mod
Structure length145 ft (44.3 m)
Longest span58 ft (17.7 m)
Deck width65 ft (19.7 m)
Roadway width61 ft (18.7 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic16,463 (2015)
Projected traffic22,851 by 2035
Trucks5%
Lanes on structure3
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was I275 SB over CR 61(HOPPER Hill Road) built?

It was built in 1972, making it 53 years old in 2025. It was reconstructed in 2003.

What condition is I275 SB over CR 61(HOPPER Hill Road) in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in February 2024.

How much traffic does I275 SB over CR 61(HOPPER Hill Road) carry?

About 16,463 vehicles per day (2015 count), of which roughly 5% are trucks.

How long is I275 SB over CR 61(HOPPER Hill Road)?

The structure is 145 ft (44.3 m) long with a longest span of 58 ft (17.7 m) and a deck 65 ft wide.

Who owns I275 SB over CR 61(HOPPER Hill Road)?

It is owned by the State Highway Agency.