US Bridges

Ir 275 NB over SR 125

Good

Clermont County, Ohio · Over SR125 · Structure no. 1305816

Built
1970
55 years old, rebuilt 2003
Condition
Good
inspected January 2024
Type
Stringer/Multi-beam or Girder
Steel Continuous
Length
162 ft
3 main spans
Daily traffic
5,744
2015 count
Owner
State
State Highway Agency

About this bridge

Ir 275 NB over SR 125 is a steel continuous stringer/multi-beam or girder carrying Ir 275 NB over SR 125 in Clermont County, Ohio. It was built in 1970 and reconstructed in 2003, so it is 55 years old, older than the Ohio average of 47.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 5,744 vehicles a day, roughly 5% of them trucks, projected to reach 7,973 by 2035. The structure is 162 ft (49.5 m) long and 85 ft wide.

CarriesIr 275 NB
CrossesSR 125
LocationOver SR125
RouteInterstate 275
StateOhio
Coordinates39.06853, -84.29899
Functional classUrban Principal Arterial - Interstate

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure7 GoodSome minor problems.
Last inspectionJanuary 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment9: Superior to present desirable criteria
Operating rating39.7 US tons
Inventory rating30.8 US tons

Structure

MaterialSteel Continuous
DeckConcrete, cast-in-place
Main spans3
Design loadHS 20 + Mod
Structure length162 ft (49.5 m)
Longest span84 ft (25.6 m)
Deck width85 ft (25.9 m)
Roadway width82 ft (25 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic5,744 (2015)
Projected traffic7,973 by 2035
Trucks5%
Lanes on structure3
Traffic directionOne-way traffic
CarriesOverpass structure at an interchange
CrossesHighway
Detour if closed—
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Ir 275 NB over SR 125 built?

It was built in 1970, making it 55 years old in 2025. It was reconstructed in 2003.

What condition is Ir 275 NB over SR 125 in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in January 2024.

How much traffic does Ir 275 NB over SR 125 carry?

About 5,744 vehicles per day (2015 count), of which roughly 5% are trucks.

How long is Ir 275 NB over SR 125?

The structure is 162 ft (49.5 m) long with a longest span of 84 ft (25.6 m) and a deck 85 ft wide.

Who owns Ir 275 NB over SR 125?

It is owned by the State Highway Agency.