US Bridges

Ramp over Ramp M over IR275 @ SR32

Good

Clermont County, Ohio · Over IR275 & SR32 · Structure no. 1305727

Built
2015
10 years old
Condition
Good
inspected January 2024
Type
Stringer/Multi-beam or Girder
Steel Continuous
Length
223 ft
2 main spans
Daily traffic
7,700
2010 count
Owner
State
State Highway Agency

About this bridge

Ramp over Ramp M over IR275 @ SR32 is a steel continuous stringer/multi-beam or girder carrying Ramp over Ramp M over IR275 @ SR32 in Clermont County, Ohio. It was built in 2015, so it is 10 years old, younger than the Ohio average of 47.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 7,700 vehicles a day, roughly 3% of them trucks, projected to reach 10,318 by 2030. The structure is 223 ft (68 m) long and 33 ft wide.

CarriesRamp
CrossesRamp M over IR275 @ SR32
LocationOver IR275 & SR32
RouteInterstate 275
StateOhio
Coordinates39.09999, -84.28551
Functional classUrban Principal Arterial - Interstate

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Last inspectionJanuary 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation8: Equal to present desirable criteria
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating65.4 US tons
Inventory rating50.4 US tons

Structure

MaterialSteel Continuous
DeckConcrete, cast-in-place
Main spans2
Design loadHS 25 or greater
Structure length223 ft (68 m)
Longest span110 ft (33.5 m)
Deck width33 ft (10.1 m)
Roadway width30 ft (9.1 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic7,700 (2010)
Projected traffic10,318 by 2030
Trucks3%
Lanes on structure1
Traffic directionOne-way traffic
CarriesOverpass structure at an interchange
CrossesHighway
Detour if closed—
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Ramp over Ramp M over IR275 @ SR32 built?

It was built in 2015, making it 10 years old in 2025.

What condition is Ramp over Ramp M over IR275 @ SR32 in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in January 2024.

How much traffic does Ramp over Ramp M over IR275 @ SR32 carry?

About 7,700 vehicles per day (2010 count), of which roughly 3% are trucks.

How long is Ramp over Ramp M over IR275 @ SR32?

The structure is 223 ft (68 m) long with a longest span of 110 ft (33.5 m) and a deck 33 ft wide.

Who owns Ramp over Ramp M over IR275 @ SR32?

It is owned by the State Highway Agency.