Ramp B IR275 over Aicholtz Road (future)
GoodClermont County, Ohio · Ramp from 275 NB to 32 EB · Structure no. 1305395
- Built
- 2014
- 11 years old
- Condition
- Good
- inspected January 2024
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 190 ft
- 3 main spans
- Daily traffic
- 17,800
- 2010 count
- Owner
- State
- State Highway Agency
About this bridge
Ramp B IR275 over Aicholtz Road (future) is a prestressed concrete stringer/multi-beam or girder carrying Ramp B IR275 over Aicholtz Road (future) in Clermont County, Ohio. It was built in 2014, so it is 11 years old, younger than the Ohio average of 47.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 17,800 vehicles a day, roughly 3% of them trucks, projected to reach 21,360 by 2030. The structure is 190 ft (57.9 m) long and 45 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 8 Very Good | No problems noted. |
| Superstructure | 9 Excellent | No problems noted. |
| Substructure | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Ramp B IR275 over Aicholtz Road (future) built?
It was built in 2014, making it 11 years old in 2025.
What condition is Ramp B IR275 over Aicholtz Road (future) in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in January 2024.
How much traffic does Ramp B IR275 over Aicholtz Road (future) carry?
About 17,800 vehicles per day (2010 count), of which roughly 3% are trucks.
How long is Ramp B IR275 over Aicholtz Road (future)?
The structure is 190 ft (57.9 m) long with a longest span of 78 ft (23.7 m) and a deck 45 ft wide.
Who owns Ramp B IR275 over Aicholtz Road (future)?
It is owned by the State Highway Agency.