T-69 over Garlough Ov Lit.Miami
GoodPosted for loadClark County, Ohio · .5 Mile So.N.River Rd. · Structure no. 1256246
- Built
- 1995
- 30 years old
- Condition
- Good
- inspected November 2024
- Type
- Truss - Thru
- Steel
- Length
- 152 ft
- 1 main span
- Daily traffic
- 305
- 2015 count
- Owner
- County
- County Highway Agency
About this bridge
T-69 over Garlough Ov Lit.Miami is a steel truss - thru carrying T-69 over Garlough Ov Lit.Miami in Clark County, Ohio. It was built in 1995, so it is 30 years old, younger than the Ohio average of 47.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. Its operating status is: posted for load restriction.
It carries about 305 vehicles a day, roughly 7% of them trucks, projected to reach 423 by 2035. The structure is 152 ft (46.3 m) long and 24 ft wide. If it were closed, the detour would be 3.1 mi (5 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 9 Excellent | No problems noted. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was T-69 over Garlough Ov Lit.Miami built?
It was built in 1995, making it 30 years old in 2025.
What condition is T-69 over Garlough Ov Lit.Miami in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in November 2024.
How much traffic does T-69 over Garlough Ov Lit.Miami carry?
About 305 vehicles per day (2015 count), of which roughly 7% are trucks.
How long is T-69 over Garlough Ov Lit.Miami?
The structure is 152 ft (46.3 m) long with a longest span of 148 ft (45.1 m) and a deck 24 ft wide.
Who owns T-69 over Garlough Ov Lit.Miami?
It is owned by the County Highway Agency.