SR 7 over County RD 7 & Wegee Cree
GoodBelmont County, Ohio · 0.44MI S of Shadyside Scl · Structure no. 0700223
- Built
- 1975
- 50 years old, rebuilt 2022
- Condition
- Good
- inspected May 2024
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 349 ft
- 5 main spans
- Daily traffic
- 14,218
- 2015 count
- Owner
- State
- State Highway Agency
About this bridge
SR 7 over County RD 7 & Wegee Cree is a prestressed concrete stringer/multi-beam or girder carrying SR 7 over County RD 7 & Wegee Cree in Belmont County, Ohio. It was built in 1975 and reconstructed in 2022, so it is 50 years old, older than the Ohio average of 47.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 14,218 vehicles a day, roughly 15% of them trucks, projected to reach 19,735 by 2035. The structure is 349 ft (106.4 m) long and 75 ft wide.
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 9 Excellent | No problems noted. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 8 Very Good | No problems noted. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was SR 7 over County RD 7 & Wegee Cree built?
It was built in 1975, making it 50 years old in 2025. It was reconstructed in 2022.
What condition is SR 7 over County RD 7 & Wegee Cree in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in May 2024.
How much traffic does SR 7 over County RD 7 & Wegee Cree carry?
About 14,218 vehicles per day (2015 count), of which roughly 15% are trucks.
How long is SR 7 over County RD 7 & Wegee Cree?
The structure is 349 ft (106.4 m) long with a longest span of 85 ft (25.9 m) and a deck 75 ft wide.
Who owns SR 7 over County RD 7 & Wegee Cree?
It is owned by the State Highway Agency.