US Bridges

NB Off Rmpc Frm S7 over Ramp C over Wegee CR

Fair

Belmont County, Ohio · 0.46 MI S of Shadyside Sc · Structure no. 0700215

Built
1975
50 years old
Condition
Fair
inspected May 2024
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
206 ft
3 main spans
Daily traffic
9,350
1973 count
Owner
State
State Highway Agency

About this bridge

NB Off Rmpc Frm S7 over Ramp C over Wegee CR is a prestressed concrete stringer/multi-beam or girder carrying NB Off Rmpc Frm S7 over Ramp C over Wegee CR in Belmont County, Ohio. It was built in 1975, so it is 50 years old, older than the Ohio average of 47.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 9,350 vehicles a day, roughly 5% of them trucks, projected to reach 12,978 by 1993. The structure is 206 ft (62.8 m) long and 28 ft wide.

CarriesNB Off Rmpc Frm S7
CrossesRamp C over Wegee CR
Location0.46 MI S of Shadyside Sc
RouteState Highway 7
StateOhio
Coordinates39.95938, -80.7607
Functional classUrban Other Principal Arterial

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure6 SatisfactoryStructural elements show some minor deterioration.
Substructure7 GoodSome minor problems.
Channel and channel protection7 GoodSome minor problems.
Last inspectionMay 2024
Inspection intervalevery 12 months
Operating statusOpen, no restriction
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation6: Equal to present minimum criteria
Deck geometry3: Basically intolerable, requiring high priority of corrective action
Waterway adequacy9: Superior to present desirable criteria
Approach roadway alignment9: Superior to present desirable criteria
Operating rating83.6 US tons
Inventory rating53.2 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans3
Design loadHS 20
Structure length206 ft (62.8 m)
Longest span67 ft (20.4 m)
Deck width28 ft (8.5 m)
Roadway width28 ft (8.5 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic9,350 (1973)
Projected traffic12,978 by 1993
Trucks5%
Lanes on structure2
Traffic directionOne-way traffic
CarriesHighway
CrossesWaterway
Detour if closed—
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was NB Off Rmpc Frm S7 over Ramp C over Wegee CR built?

It was built in 1975, making it 50 years old in 2025.

What condition is NB Off Rmpc Frm S7 over Ramp C over Wegee CR in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in May 2024.

How much traffic does NB Off Rmpc Frm S7 over Ramp C over Wegee CR carry?

About 9,350 vehicles per day (1973 count), of which roughly 5% are trucks.

How long is NB Off Rmpc Frm S7 over Ramp C over Wegee CR?

The structure is 206 ft (62.8 m) long with a longest span of 67 ft (20.4 m) and a deck 28 ft wide.

Who owns NB Off Rmpc Frm S7 over Ramp C over Wegee CR?

It is owned by the State Highway Agency.