NB Off Rmpc Frm S7 over Ramp C over Wegee CR
FairBelmont County, Ohio · 0.46 MI S of Shadyside Sc · Structure no. 0700215
- Built
- 1975
- 50 years old
- Condition
- Fair
- inspected May 2024
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 206 ft
- 3 main spans
- Daily traffic
- 9,350
- 1973 count
- Owner
- State
- State Highway Agency
About this bridge
NB Off Rmpc Frm S7 over Ramp C over Wegee CR is a prestressed concrete stringer/multi-beam or girder carrying NB Off Rmpc Frm S7 over Ramp C over Wegee CR in Belmont County, Ohio. It was built in 1975, so it is 50 years old, older than the Ohio average of 47.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 9,350 vehicles a day, roughly 5% of them trucks, projected to reach 12,978 by 1993. The structure is 206 ft (62.8 m) long and 28 ft wide.
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was NB Off Rmpc Frm S7 over Ramp C over Wegee CR built?
It was built in 1975, making it 50 years old in 2025.
What condition is NB Off Rmpc Frm S7 over Ramp C over Wegee CR in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in May 2024.
How much traffic does NB Off Rmpc Frm S7 over Ramp C over Wegee CR carry?
About 9,350 vehicles per day (1973 count), of which roughly 5% are trucks.
How long is NB Off Rmpc Frm S7 over Ramp C over Wegee CR?
The structure is 206 ft (62.8 m) long with a longest span of 67 ft (20.4 m) and a deck 28 ft wide.
Who owns NB Off Rmpc Frm S7 over Ramp C over Wegee CR?
It is owned by the State Highway Agency.