US Bridges

Ramp from Tsp NB over 987G987G87011050 RTE 98

Good

Westchester County, New York · 1 MI S of CR40 JCT on Tsp · Structure no. 000000005523860

Built
1992
33 years old
Condition
Good
inspected June 2024
Type
Stringer/Multi-beam or Girder
Steel Continuous
Length
235 ft
2 main spans
Daily traffic
12,894
2018 count
Owner
State
State Highway Agency

About this bridge

Ramp from Tsp NB over 987G987G87011050 RTE 98 is a steel continuous stringer/multi-beam or girder carrying Ramp from Tsp NB over 987G987G87011050 RTE 98 in Westchester County, New York. It was built in 1992, so it is 33 years old, younger than the New York average of 53 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 12,894 vehicles a day, roughly 2% of them trucks, projected to reach 18,189 by 2041. The structure is 235 ft (71.6 m) long and 26 ft wide.

CarriesRamp from Tsp NB
Crosses987G987G87011050 RTE 98
Location1 MI S of CR40 JCT on Tsp
Coordinates41.13047, -73.81507
Functional classUrban Principal Arterial - Other Freeway or Expressway

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionJune 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry6: Equal to present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating97 US tons
Inventory rating58 US tons

Structure

MaterialSteel Continuous
DeckConcrete, cast-in-place
Main spans2
Design loadHS 20
Structure length235 ft (71.6 m)
Longest span116 ft (35.3 m)
Deck width26 ft (7.8 m)
Roadway width23 ft (7 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic12,894 (2018)
Projected traffic18,189 by 2041
Trucks2%
Lanes on structure1
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed—
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedWidening with deck rehabilitation or replacement
Estimated improvement cost$5.3 million (2024 estimate)
NavigationNot applicable (no waterway)

Frequently asked questions

When was Ramp from Tsp NB over 987G987G87011050 RTE 98 built?

It was built in 1992, making it 33 years old in 2025.

What condition is Ramp from Tsp NB over 987G987G87011050 RTE 98 in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in June 2024.

How much traffic does Ramp from Tsp NB over 987G987G87011050 RTE 98 carry?

About 12,894 vehicles per day (2018 count), of which roughly 2% are trucks.

How long is Ramp from Tsp NB over 987G987G87011050 RTE 98?

The structure is 235 ft (71.6 m) long with a longest span of 116 ft (35.3 m) and a deck 26 ft wide.

Who owns Ramp from Tsp NB over 987G987G87011050 RTE 98?

It is owned by the State Highway Agency.