RTE 9A over Pocantico River.
FairWestchester County, New York · 0.8 MI N JCT Rts 9A+117 · Structure no. 000000001006150
- Built
- 1929
- 96 years old
- Condition
- Fair
- inspected March 2024
- Type
- Arch - Deck
- Concrete
- Length
- 27 ft
- 1 main span
- Daily traffic
- 43,830
- 2011 count
- Owner
- State
- State Highway Agency
About this bridge
RTE 9A over Pocantico River. is a concrete arch - deck carrying RTE 9A over Pocantico River. in Westchester County, New York. It was built in 1929, so it is 96 years old, older than the New York average of 53 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 43,830 vehicles a day, roughly 5% of them trucks, projected to reach 44,036 by 2041. The structure is 27 ft (8.2 m) long and 59 ft wide. If it were closed, the detour would be 1.9 mi (3 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was RTE 9A over Pocantico River. built?
It was built in 1929, making it 96 years old in 2025.
What condition is RTE 9A over Pocantico River. in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in March 2024.
How much traffic does RTE 9A over Pocantico River. carry?
About 43,830 vehicles per day (2011 count), of which roughly 5% are trucks.
How long is RTE 9A over Pocantico River.?
The structure is 27 ft (8.2 m) long with a longest span of 26 ft (7.9 m) and a deck 59 ft wide.
Who owns RTE 9A over Pocantico River.?
It is owned by the State Highway Agency.