US Bridges

RTE I95 over Cedar Street

Fair

Westchester County, New York · 1.4 Mi. N. JCT I95 & US-1 · Structure no. 000000005514579

Built
1958
67 years old, rebuilt 2017
Condition
Fair
inspected April 2023
Type
Frame
Concrete
Length
58 ft
1 main span
Daily traffic
105,979
2018 count
Owner
Toll Authority
State Toll Authority

About this bridge

RTE I95 over Cedar Street is a concrete frame carrying RTE I95 over Cedar Street in Westchester County, New York. It was built in 1958 and reconstructed in 2017, so it is 67 years old, older than the New York average of 53 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 105,979 vehicles a day, roughly 13% of them trucks, projected to reach 179,464 by 2041. The structure is 58 ft (17.7 m) long and 128 ft wide. If it were closed, the detour would be 0.6 mi (1 km).

CarriesRTE I95
CrossesCedar Street
Location1.4 Mi. N. JCT I95 & US-1
RouteInterstate 95
Coordinates40.91644, -73.78187
Functional classUrban Principal Arterial - Interstate

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure7 GoodSome minor problems.
Substructure6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionApril 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation6: Equal to present minimum criteria
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating92 US tons
Inventory rating36 US tons

Structure

Structure typeFrame
MaterialConcrete
DeckNot applicable
Main spans1
Design loadHS 25 or greater
Structure length58 ft (17.7 m)
Longest span50 ft (15.2 m)
Deck width128 ft (38.9 m)
Roadway width121 ft (37 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic105,979 (2018)
Projected traffic179,464 by 2041
Trucks13%
Lanes on structure8
Traffic directionTwo-way traffic
CarriesHighway
CrossesHighway
Detour if closed0.6 mi (1 km)
TollOn an Interstate toll segment under Secretarial agreement
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Toll Authority
Maintained byState Toll Authority
Historic statusHistorical significance not determinable at this time
Work proposedWidening with deck rehabilitation or replacement
Estimated improvement cost$8.5 million (2024 estimate)
NavigationNot applicable (no waterway)

Frequently asked questions

When was RTE I95 over Cedar Street built?

It was built in 1958, making it 67 years old in 2025. It was reconstructed in 2017.

What condition is RTE I95 over Cedar Street in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in April 2023.

How much traffic does RTE I95 over Cedar Street carry?

About 105,979 vehicles per day (2018 count), of which roughly 13% are trucks.

How long is RTE I95 over Cedar Street?

The structure is 58 ft (17.7 m) long with a longest span of 50 ft (15.2 m) and a deck 128 ft wide.

Who owns RTE I95 over Cedar Street?

It is owned by the State Toll Authority.