US Bridges

RTE 119 over 907G Bronx River Pathwa

Fair

Westchester County, New York · JCT S.H.119 & Brp · Structure no. 000000003348690

Built
1922
103 years old, rebuilt 1992
Condition
Fair
inspected April 2023
Type
Frame
Concrete Continuous
Length
123 ft
2 main spans
Daily traffic
—
2024 count
Owner
County
County Highway Agency

About this bridge

RTE 119 over 907G Bronx River Pathwa is a concrete continuous frame carrying RTE 119 over 907G Bronx River Pathwa in Westchester County, New York. It was built in 1922 and reconstructed in 1992, so it is 103 years old, older than the New York average of 53 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

No traffic count is recorded. The structure is 123 ft (37.5 m) long and 75 ft wide. If it were closed, the detour would be 0.6 mi (1 km).

CarriesRTE 119
Crosses907G Bronx River Pathwa
LocationJCT S.H.119 & Brp
RouteState Highway 119
Coordinates41.03168, -73.77589
Functional classUrban Other Principal Arterial

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Superstructure5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Substructure6 SatisfactoryStructural elements show some minor deterioration.
Channel and channel protection7 GoodSome minor problems.
Last inspectionApril 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation5: Somewhat better than minimum adequacy to tolerate being left in place as is
Deck geometry3: Basically intolerable, requiring high priority of corrective action
Waterway adequacy5: Somewhat better than minimum adequacy to tolerate being left in place as is
Approach roadway alignment4: Meets minimum tolerable limits to be left in place as is
Operating rating60 US tons
Inventory rating36 US tons

Structure

Structure typeFrame
MaterialConcrete Continuous
DeckNot applicable
Main spans2
Design loadHS 20
Structure length123 ft (37.5 m)
Longest span41 ft (12.4 m)
Deck width75 ft (22.9 m)
Roadway width50 ft (15.2 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic—
Projected traffic—
Trucks5%
Lanes on structure4
Traffic directionOne-way traffic
CarriesHighway and pedestrian
CrossesHighway and waterway
Detour if closed0.6 mi (1 km)
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusHistorical significance not determinable at this time
Work proposedWidening with deck rehabilitation or replacement
Estimated improvement cost$6.7 million (2024 estimate)
NavigationNo navigation control on waterway

Frequently asked questions

When was RTE 119 over 907G Bronx River Pathwa built?

It was built in 1922, making it 103 years old in 2025. It was reconstructed in 1992.

What condition is RTE 119 over 907G Bronx River Pathwa in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in April 2023.

How much traffic does RTE 119 over 907G Bronx River Pathwa carry?

No traffic count is recorded for this structure.

How long is RTE 119 over 907G Bronx River Pathwa?

The structure is 123 ft (37.5 m) long with a longest span of 41 ft (12.4 m) and a deck 75 ft wide.

Who owns RTE 119 over 907G Bronx River Pathwa?

It is owned by the County Highway Agency.