US Bridges

RTE 119 over 907G Brp 907G Brp Bron

Fair

Westchester County, New York · JCT Hamilton Ave & Brp · Structure no. 000000003348050

Built
1987
38 years old
Condition
Fair
inspected May 2023
Type
Stringer/Multi-beam or Girder
Steel Continuous
Length
136 ft
2 main spans
Daily traffic
—
2024 count
Owner
State
State Highway Agency

About this bridge

RTE 119 over 907G Brp 907G Brp Bron is a steel continuous stringer/multi-beam or girder carrying RTE 119 over 907G Brp 907G Brp Bron in Westchester County, New York. It was built in 1987, so it is 38 years old, younger than the New York average of 53 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

No traffic count is recorded. The structure is 136 ft (41.5 m) long and 84 ft wide. If it were closed, the detour would be 0.6 mi (1 km).

CarriesRTE 119
Crosses907G Brp 907G Brp Bron
LocationJCT Hamilton Ave & Brp
RouteState Highway 119
Coordinates41.03252, -73.77572
Functional classUrban Other Principal Arterial

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure6 SatisfactoryStructural elements show some minor deterioration.
Substructure6 SatisfactoryStructural elements show some minor deterioration.
Channel and channel protection7 GoodSome minor problems.
Last inspectionMay 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation6: Equal to present minimum criteria
Deck geometry3: Basically intolerable, requiring high priority of corrective action
Waterway adequacy5: Somewhat better than minimum adequacy to tolerate being left in place as is
Approach roadway alignment3: Basically intolerable, requiring high priority of corrective action
Operating rating61.8 US tons
Inventory rating47.5 US tons

Structure

MaterialSteel Continuous
DeckConcrete, cast-in-place
Main spans2
Design loadHS 20
Structure length136 ft (41.5 m)
Longest span73 ft (22.2 m)
Deck width84 ft (25.6 m)
Roadway width61 ft (18.6 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic—
Projected traffic—
Trucks5%
Lanes on structure5
Traffic directionOne-way traffic
CarriesHighway and pedestrian
CrossesHighway and waterway
Detour if closed0.6 mi (1 km)
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedWidening with deck rehabilitation or replacement
Estimated improvement cost$10.4 million (2024 estimate)
NavigationNo navigation control on waterway

Frequently asked questions

When was RTE 119 over 907G Brp 907G Brp Bron built?

It was built in 1987, making it 38 years old in 2025.

What condition is RTE 119 over 907G Brp 907G Brp Bron in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in May 2023.

How much traffic does RTE 119 over 907G Brp 907G Brp Bron carry?

No traffic count is recorded for this structure.

How long is RTE 119 over 907G Brp 907G Brp Bron?

The structure is 136 ft (41.5 m) long with a longest span of 73 ft (22.2 m) and a deck 84 ft wide.

Who owns RTE 119 over 907G Brp 907G Brp Bron?

It is owned by the State Highway Agency.