RTE 209 over Pine Kill
PoorSullivan County, New York · 0.2 MI NE Orange Cl · Structure no. 000000001040670
- Built
- 1928
- 97 years old
- Condition
- Poor
- inspected June 2023
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 44 ft
- 1 main span
- Daily traffic
- 3,645
- 2020 count
- Owner
- State
- State Highway Agency
About this bridge
RTE 209 over Pine Kill is a steel stringer/multi-beam or girder carrying RTE 209 over Pine Kill in Sullivan County, New York. It was built in 1928, so it is 97 years old, older than the New York average of 53 years.
The most recent inspection reported to the Federal Highway Administration rates it in poor condition with a lowest component rating of 4 out of 9. The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions.
It carries about 3,645 vehicles a day, roughly 9% of them trucks, projected to reach 3,679 by 2041. The structure is 44 ft (13.4 m) long and 33 ft wide. If it were closed, the detour would be 3.7 mi (6 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 4 Poor | Advanced section loss, deterioration, spalling or scour. |
| Superstructure | 4 Poor | Advanced section loss, deterioration, spalling or scour. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was RTE 209 over Pine Kill built?
It was built in 1928, making it 97 years old in 2025.
What condition is RTE 209 over Pine Kill in?
The National Bridge Inventory rates it in poor condition. The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions. The last reported inspection was in June 2023.
How much traffic does RTE 209 over Pine Kill carry?
About 3,645 vehicles per day (2020 count), of which roughly 9% are trucks.
How long is RTE 209 over Pine Kill?
The structure is 44 ft (13.4 m) long with a longest span of 40 ft (12.1 m) and a deck 33 ft wide.
Who owns RTE 209 over Pine Kill?
It is owned by the State Highway Agency.