RTE 211 over Mnrr Pj Line
PoorOrange County, New York · 2 MI E JCT US209 & SH211 · Structure no. 000000001040910
- Built
- 1978
- 47 years old
- Condition
- Poor
- inspected July 2024
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 233 ft
- 3 main spans
- Daily traffic
- 2,037
- 2018 count
- Owner
- State
- State Highway Agency
About this bridge
RTE 211 over Mnrr Pj Line is a steel stringer/multi-beam or girder carrying RTE 211 over Mnrr Pj Line in Orange County, New York. It was built in 1978, so it is 47 years old, younger than the New York average of 53 years.
The most recent inspection reported to the Federal Highway Administration rates it in poor condition with a lowest component rating of 4 out of 9. The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions.
It carries about 2,037 vehicles a day, roughly 4% of them trucks, projected to reach 2,124 by 2041. The structure is 233 ft (71 m) long and 40 ft wide. If it were closed, the detour would be 5.6 mi (9 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 4 Poor | Advanced section loss, deterioration, spalling or scour. |
| Substructure | 4 Poor | Advanced section loss, deterioration, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was RTE 211 over Mnrr Pj Line built?
It was built in 1978, making it 47 years old in 2025.
What condition is RTE 211 over Mnrr Pj Line in?
The National Bridge Inventory rates it in poor condition. The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions. The last reported inspection was in July 2024.
How much traffic does RTE 211 over Mnrr Pj Line carry?
About 2,037 vehicles per day (2018 count), of which roughly 4% are trucks.
How long is RTE 211 over Mnrr Pj Line?
The structure is 233 ft (71 m) long with a longest span of 94 ft (28.6 m) and a deck 40 ft wide.
Who owns RTE 211 over Mnrr Pj Line?
It is owned by the State Highway Agency.