RTE 908M over Straight Path
FairSuffolk County, New York · 1.8 MI E JCT SH 109 & Ssp · Structure no. 000000001059779
- Built
- 1941
- 84 years old
- Condition
- Fair
- inspected February 2024
- Type
- Frame
- Concrete
- Length
- 74 ft
- 1 main span
- Daily traffic
- 138,738
- 2020 count
- Owner
- State
- State Highway Agency
About this bridge
RTE 908M over Straight Path is a concrete frame carrying RTE 908M over Straight Path in Suffolk County, New York. It was built in 1941, so it is 84 years old, older than the New York average of 53 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 138,738 vehicles a day, projected to reach 165,028 by 2041. The structure is 74 ft (22.5 m) long and 122 ft wide. If it were closed, the detour would be 1.9 mi (3 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was RTE 908M over Straight Path built?
It was built in 1941, making it 84 years old in 2025.
What condition is RTE 908M over Straight Path in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in February 2024.
How much traffic does RTE 908M over Straight Path carry?
About 138,738 vehicles per day (2020 count).
How long is RTE 908M over Straight Path?
The structure is 74 ft (22.5 m) long with a longest span of 69 ft (21 m) and a deck 122 ft wide.
Who owns RTE 908M over Straight Path?
It is owned by the State Highway Agency.