Pinelawn Road over 495I 495I 07031019 RTE
FairSuffolk County, New York · .5 MI E RTE 495+RTE 110 · Structure no. 000000001049309
- Built
- 1962
- 63 years old, rebuilt 2014
- Condition
- Fair
- inspected July 2024
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 266 ft
- 4 main spans
- Daily traffic
- 20,775
- 2019 count
- Owner
- State
- State Highway Agency
About this bridge
Pinelawn Road over 495I 495I 07031019 RTE is a steel stringer/multi-beam or girder carrying Pinelawn Road over 495I 495I 07031019 RTE in Suffolk County, New York. It was built in 1962 and reconstructed in 2014, so it is 63 years old, older than the New York average of 53 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 20,775 vehicles a day, roughly 4% of them trucks, projected to reach 25,237 by 2041. The structure is 266 ft (81.1 m) long and 73 ft wide. If it were closed, the detour would be 1.9 mi (3 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Pinelawn Road over 495I 495I 07031019 RTE built?
It was built in 1962, making it 63 years old in 2025. It was reconstructed in 2014.
What condition is Pinelawn Road over 495I 495I 07031019 RTE in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in July 2024.
How much traffic does Pinelawn Road over 495I 495I 07031019 RTE carry?
About 20,775 vehicles per day (2019 count), of which roughly 4% are trucks.
How long is Pinelawn Road over 495I 495I 07031019 RTE?
The structure is 266 ft (81.1 m) long with a longest span of 87 ft (26.5 m) and a deck 73 ft wide.
Who owns Pinelawn Road over 495I 495I 07031019 RTE?
It is owned by the State Highway Agency.