US Bridges

RTE I390 over Neil Creek

Fair

Steuben County, New York · .3 Mile SE of Wallace · Structure no. 000000001090622

Built
1974
51 years old, rebuilt 2006
Condition
Fair
inspected August 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
69 ft
1 main span
Daily traffic
5,092
2021 count
Owner
State
State Highway Agency

About this bridge

RTE I390 over Neil Creek is a prestressed concrete stringer/multi-beam or girder carrying RTE I390 over Neil Creek in Steuben County, New York. It was built in 1974 and reconstructed in 2006, so it is 51 years old, younger than the New York average of 53 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 5,092 vehicles a day, roughly 35% of them trucks, projected to reach 9,499 by 2041. The structure is 69 ft (21 m) long and 44 ft wide. If it were closed, the detour would be 0.6 mi (1 km).

CarriesRTE I390
CrossesNeil Creek
Location.3 Mile SE of Wallace
RouteInterstate 390
Coordinates42.43741, -77.45326
Functional classRural Principal Arterial - Interstate

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Substructure7 GoodSome minor problems.
Channel and channel protection7 GoodSome minor problems.
Last inspectionAugust 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation5: Somewhat better than minimum adequacy to tolerate being left in place as is
Deck geometry8: Equal to present desirable criteria
Waterway adequacy4: Meets minimum tolerable limits to be left in place as is
Approach roadway alignment8: Equal to present desirable criteria
Operating rating45 US tons
Inventory rating27 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans1
Design loadHS 20
Structure length69 ft (21 m)
Longest span65 ft (19.8 m)
Deck width44 ft (13.4 m)
Roadway width42 ft (12.8 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic5,092 (2021)
Projected traffic9,499 by 2041
Trucks35%
Lanes on structure2
Traffic directionOne-way traffic
CarriesHighway
CrossesWaterway
Detour if closed0.6 mi (1 km)
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedWidening with deck rehabilitation or replacement
Estimated improvement cost$1.9 million (2024 estimate)
NavigationNo navigation control on waterway

Frequently asked questions

When was RTE I390 over Neil Creek built?

It was built in 1974, making it 51 years old in 2025. It was reconstructed in 2006.

What condition is RTE I390 over Neil Creek in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in August 2023.

How much traffic does RTE I390 over Neil Creek carry?

About 5,092 vehicles per day (2021 count), of which roughly 35% are trucks.

How long is RTE I390 over Neil Creek?

The structure is 69 ft (21 m) long with a longest span of 65 ft (19.8 m) and a deck 44 ft wide.

Who owns RTE I390 over Neil Creek?

It is owned by the State Highway Agency.