RTE I390 over Neil Creek
FairSteuben County, New York · .3 Mile SE of Wallace · Structure no. 000000001090621
- Built
- 1974
- 51 years old, rebuilt 2006
- Condition
- Fair
- inspected August 2023
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 67 ft
- 1 main span
- Daily traffic
- 5,128
- 2013 count
- Owner
- State
- State Highway Agency
About this bridge
RTE I390 over Neil Creek is a prestressed concrete stringer/multi-beam or girder carrying RTE I390 over Neil Creek in Steuben County, New York. It was built in 1974 and reconstructed in 2006, so it is 51 years old, younger than the New York average of 53 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 5,128 vehicles a day, roughly 37% of them trucks. The structure is 67 ft (20.4 m) long and 44 ft wide. If it were closed, the detour would be 0.6 mi (1 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was RTE I390 over Neil Creek built?
It was built in 1974, making it 51 years old in 2025. It was reconstructed in 2006.
What condition is RTE I390 over Neil Creek in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in August 2023.
How much traffic does RTE I390 over Neil Creek carry?
About 5,128 vehicles per day (2013 count), of which roughly 37% are trucks.
How long is RTE I390 over Neil Creek?
The structure is 67 ft (20.4 m) long with a longest span of 65 ft (19.8 m) and a deck 44 ft wide.
Who owns RTE I390 over Neil Creek?
It is owned by the State Highway Agency.