RTE I278 over Relief
FairRichmond County, New York · I278 over the Narrows · Structure no. 00000000552121H
- Built
- 1961
- 64 years old, rebuilt 1967
- Condition
- Fair
- inspected August 2024
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 372 ft
- 3 main spans
- Daily traffic
- 35,770
- 2020 count
- Owner
- Toll Authority
- Local Toll Authority
About this bridge
RTE I278 over Relief is a steel stringer/multi-beam or girder carrying RTE I278 over Relief in Richmond County, New York. It was built in 1961 and reconstructed in 1967, so it is 64 years old, older than the New York average of 53 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 35,770 vehicles a day, roughly 8% of them trucks, projected to reach 45,706 by 2041. The structure is 372 ft (113.4 m) long and 31 ft wide. If it were closed, the detour would be 1.9 mi (3 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was RTE I278 over Relief built?
It was built in 1961, making it 64 years old in 2025. It was reconstructed in 1967.
What condition is RTE I278 over Relief in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in August 2024.
How much traffic does RTE I278 over Relief carry?
About 35,770 vehicles per day (2020 count), of which roughly 8% are trucks.
How long is RTE I278 over Relief?
The structure is 372 ft (113.4 m) long with a longest span of 127 ft (38.7 m) and a deck 31 ft wide.
Who owns RTE I278 over Relief?
It is owned by the Local Toll Authority.