RTE I278 over Relief
FairRichmond County, New York · I278 over the Narrows · Structure no. 00000000552121D
- Built
- 1961
- 64 years old
- Condition
- Fair
- inspected September 2024
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 636 ft
- 5 main spans
- Daily traffic
- —
- 2018 count
- Owner
- Toll Authority
- Local Toll Authority
About this bridge
RTE I278 over Relief is a steel stringer/multi-beam or girder carrying RTE I278 over Relief in Richmond County, New York. It was built in 1961, so it is 64 years old, older than the New York average of 53 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
No traffic count is recorded. The structure is 636 ft (193.9 m) long and 26 ft wide.
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was RTE I278 over Relief built?
It was built in 1961, making it 64 years old in 2025.
What condition is RTE I278 over Relief in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in September 2024.
How much traffic does RTE I278 over Relief carry?
No traffic count is recorded for this structure.
How long is RTE I278 over Relief?
The structure is 636 ft (193.9 m) long with a longest span of 130 ft (39.6 m) and a deck 26 ft wide.
Who owns RTE I278 over Relief?
It is owned by the Local Toll Authority.