US Bridges

278I278IX6M13069 over Sirt RR

Good

Richmond County, New York · 2.6 MI W JCT I278&BLT Pky · Structure no. 000000001075752

Built
2019
6 years old
Condition
Good
inspected November 2024
Type
Box Beam or Girders - Multiple
Prestressed Concrete
Length
100 ft
1 main span
Daily traffic
3,994
2020 count
Owner
State
State Highway Agency

About this bridge

278I278IX6M13069 over Sirt RR is a prestressed concrete box beam or girders - multiple carrying 278I278IX6M13069 over Sirt RR in Richmond County, New York. It was built in 2019, so it is 6 years old, younger than the New York average of 53 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 3,994 vehicles a day, roughly 5% of them trucks, projected to reach 4,851 by 2041. The structure is 100 ft (30.5 m) long and 121 ft wide. If it were closed, the detour would be 0.6 mi (1 km).

Carries278I278IX6M13069
CrossesSirt RR
Location2.6 MI W JCT I278&BLT Pky
RouteInterstate 0
Coordinates40.60602, -74.08174
Functional classUrban Minor Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure7 GoodSome minor problems.
Last inspectionNovember 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating107.1 US tons
Inventory rating101.4 US tons

Structure

MaterialPrestressed Concrete
DeckOther
Main spans1
Design loadHL 93
Structure length100 ft (30.5 m)
Longest span98 ft (29.9 m)
Deck width121 ft (36.9 m)
Roadway width109 ft (33.2 m)
Vertical clearance over deck107 ft (32.7 m)

Traffic and service

Average daily traffic3,994 (2020)
Projected traffic4,851 by 2041
Trucks5%
Lanes on structure6
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesRailroad
Detour if closed0.6 mi (1 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedWidening with deck rehabilitation or replacement
Estimated improvement cost$7.8 million (2024 estimate)
NavigationNot applicable (no waterway)

Frequently asked questions

When was 278I278IX6M13069 over Sirt RR built?

It was built in 2019, making it 6 years old in 2025.

What condition is 278I278IX6M13069 over Sirt RR in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in November 2024.

How much traffic does 278I278IX6M13069 over Sirt RR carry?

About 3,994 vehicles per day (2020 count), of which roughly 5% are trucks.

How long is 278I278IX6M13069 over Sirt RR?

The structure is 100 ft (30.5 m) long with a longest span of 98 ft (29.9 m) and a deck 121 ft wide.

Who owns 278I278IX6M13069 over Sirt RR?

It is owned by the State Highway Agency.