US Bridges

278I278IX6MI4069 over Sirt RR

Good

Richmond County, New York · 2.6 MI W JCT I278&BLT Pky · Structure no. 000000001075751

Built
2019
6 years old
Condition
Good
inspected November 2024
Type
Box Beam or Girders - Multiple
Prestressed Concrete
Length
101 ft
1 main span
Daily traffic
8,154
2018 count
Owner
State
State Highway Agency

About this bridge

278I278IX6MI4069 over Sirt RR is a prestressed concrete box beam or girders - multiple carrying 278I278IX6MI4069 over Sirt RR in Richmond County, New York. It was built in 2019, so it is 6 years old, younger than the New York average of 53 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 8,154 vehicles a day, roughly 8% of them trucks, projected to reach 9,905 by 2041. The structure is 101 ft (30.8 m) long and 120 ft wide. If it were closed, the detour would be 0.6 mi (1 km).

Carries278I278IX6MI4069
CrossesSirt RR
Location2.6 MI W JCT I278&BLT Pky
RouteInterstate 0
Coordinates40.60651, -74.08133
Functional classUrban Minor Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure7 GoodSome minor problems.
Last inspectionNovember 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating110.1 US tons
Inventory rating59 US tons

Structure

MaterialPrestressed Concrete
DeckOther
Main spans1
Design loadHL 93
Structure length101 ft (30.8 m)
Longest span99 ft (30.2 m)
Deck width120 ft (36.6 m)
Roadway width106 ft (32.3 m)
Vertical clearance over deck107 ft (32.7 m)

Traffic and service

Average daily traffic8,154 (2018)
Projected traffic9,905 by 2041
Trucks8%
Lanes on structure6
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesRailroad
Detour if closed0.6 mi (1 km)
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedWidening with deck rehabilitation or replacement
Estimated improvement cost$7.8 million (2024 estimate)
NavigationNot applicable (no waterway)

Frequently asked questions

When was 278I278IX6MI4069 over Sirt RR built?

It was built in 2019, making it 6 years old in 2025.

What condition is 278I278IX6MI4069 over Sirt RR in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in November 2024.

How much traffic does 278I278IX6MI4069 over Sirt RR carry?

About 8,154 vehicles per day (2018 count), of which roughly 8% are trucks.

How long is 278I278IX6MI4069 over Sirt RR?

The structure is 101 ft (30.8 m) long with a longest span of 99 ft (30.2 m) and a deck 120 ft wide.

Who owns 278I278IX6MI4069 over Sirt RR?

It is owned by the State Highway Agency.