RTE 915C over Champlain Canal
FairRensselaer County, New York · .2 Mile E of Stillwater · Structure no. 000000004029210
- Built
- 1959
- 66 years old, rebuilt 1994
- Condition
- Fair
- inspected August 2024
- Type
- Truss - Thru
- Steel
- Length
- 185 ft
- 1 main span
- Daily traffic
- 3,846
- 2015 count
- Owner
- State
- State Highway Agency
About this bridge
RTE 915C over Champlain Canal is a steel truss - thru carrying RTE 915C over Champlain Canal in Rensselaer County, New York. It was built in 1959 and reconstructed in 1994, so it is 66 years old, older than the New York average of 53 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 3,846 vehicles a day, roughly 5% of them trucks, projected to reach 4,758 by 2041. The structure is 185 ft (56.4 m) long and 33 ft wide. If it were closed, the detour would be 16.8 mi (27 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was RTE 915C over Champlain Canal built?
It was built in 1959, making it 66 years old in 2025. It was reconstructed in 1994.
What condition is RTE 915C over Champlain Canal in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in August 2024.
How much traffic does RTE 915C over Champlain Canal carry?
About 3,846 vehicles per day (2015 count), of which roughly 5% are trucks.
How long is RTE 915C over Champlain Canal?
The structure is 185 ft (56.4 m) long with a longest span of 180 ft (54.8 m) and a deck 33 ft wide.
Who owns RTE 915C over Champlain Canal?
It is owned by the State Highway Agency.