US Bridges

Roadway to Termina over Parking Lot Taxi Roadwa

Good

Queens County, New York · At LA Guardia Airport · Structure no. 00000000552522B

Built
2019
6 years old
Condition
Good
inspected August 2024
Type
Stringer/Multi-beam or Girder
Steel Continuous
Length
313 ft
4 main spans
Daily traffic
—
2024 count
Owner
Toll Authority
Local Toll Authority

About this bridge

Roadway to Termina over Parking Lot Taxi Roadwa is a steel continuous stringer/multi-beam or girder carrying Roadway to Termina over Parking Lot Taxi Roadwa in Queens County, New York. It was built in 2019, so it is 6 years old, younger than the New York average of 53 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 9 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

No traffic count is recorded. The structure is 313 ft (95.4 m) long and 36 ft wide. If it were closed, the detour would be 0.6 mi (1 km).

CarriesRoadway to Termina
CrossesParking Lot Taxi Roadwa
LocationAt LA Guardia Airport
Coordinates40.76913, -73.86531
Functional classUrban Principal Arterial - Other Freeway or Expressway

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck9 ExcellentNo problems noted.
Superstructure9 ExcellentNo problems noted.
Substructure9 ExcellentNo problems noted.
Last inspectionAugust 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation9: Superior to present desirable criteria
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Approach roadway alignment3: Basically intolerable, requiring high priority of corrective action
Operating rating96 US tons
Inventory rating45 US tons

Structure

MaterialSteel Continuous
DeckConcrete, cast-in-place
Main spans4
Design loadHL 93
Structure length313 ft (95.4 m)
Longest span89 ft (27.1 m)
Deck width36 ft (11 m)
Roadway width33 ft (10 m)
Vertical clearance over deck16 ft (4.9 m)

Traffic and service

Average daily traffic—
Projected traffic—
Trucks0%
Lanes on structure2
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed0.6 mi (1 km)
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerLocal Toll Authority
Maintained byLocal Toll Authority
Historic statusNot eligible for the National Register of Historic Places
Work proposedWidening with deck rehabilitation or replacement
Estimated improvement cost$9.6 million (2024 estimate)
NavigationNot applicable (no waterway)

Frequently asked questions

When was Roadway to Termina over Parking Lot Taxi Roadwa built?

It was built in 2019, making it 6 years old in 2025.

What condition is Roadway to Termina over Parking Lot Taxi Roadwa in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in August 2024.

How much traffic does Roadway to Termina over Parking Lot Taxi Roadwa carry?

No traffic count is recorded for this structure.

How long is Roadway to Termina over Parking Lot Taxi Roadwa?

The structure is 313 ft (95.4 m) long with a longest span of 89 ft (27.1 m) and a deck 36 ft wide.

Who owns Roadway to Termina over Parking Lot Taxi Roadwa?

It is owned by the Local Toll Authority.