Roadway to Termina over Parking Lot Taxi Roadwa
GoodQueens County, New York · At LA Guardia Airport · Structure no. 00000000552522B
- Built
- 2019
- 6 years old
- Condition
- Good
- inspected August 2024
- Type
- Stringer/Multi-beam or Girder
- Steel Continuous
- Length
- 313 ft
- 4 main spans
- Daily traffic
- —
- 2024 count
- Owner
- Toll Authority
- Local Toll Authority
About this bridge
Roadway to Termina over Parking Lot Taxi Roadwa is a steel continuous stringer/multi-beam or girder carrying Roadway to Termina over Parking Lot Taxi Roadwa in Queens County, New York. It was built in 2019, so it is 6 years old, younger than the New York average of 53 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 9 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
No traffic count is recorded. The structure is 313 ft (95.4 m) long and 36 ft wide. If it were closed, the detour would be 0.6 mi (1 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 9 Excellent | No problems noted. |
| Superstructure | 9 Excellent | No problems noted. |
| Substructure | 9 Excellent | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Roadway to Termina over Parking Lot Taxi Roadwa built?
It was built in 2019, making it 6 years old in 2025.
What condition is Roadway to Termina over Parking Lot Taxi Roadwa in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in August 2024.
How much traffic does Roadway to Termina over Parking Lot Taxi Roadwa carry?
No traffic count is recorded for this structure.
How long is Roadway to Termina over Parking Lot Taxi Roadwa?
The structure is 313 ft (95.4 m) long with a longest span of 89 ft (27.1 m) and a deck 36 ft wide.
Who owns Roadway to Termina over Parking Lot Taxi Roadwa?
It is owned by the Local Toll Authority.