US Bridges

Gcp Westbound to 9 over Terrain

Good

Queens County, New York · 9 MI E I278+GCP · Structure no. 000000001080250

Built
2019
6 years old
Condition
Good
inspected October 2023
Type
Stringer/Multi-beam or Girder
Steel
Length
429 ft
4 main spans
Daily traffic
—
2024 count
Owner
State
State Highway Agency

About this bridge

Gcp Westbound to 9 over Terrain is a steel stringer/multi-beam or girder carrying Gcp Westbound to 9 over Terrain in Queens County, New York. It was built in 2019, so it is 6 years old, younger than the New York average of 53 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 9 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

No traffic count is recorded. The structure is 429 ft (130.8 m) long and 27 ft wide. If it were closed, the detour would be 0.6 mi (1 km).

CarriesGcp Westbound to 9
CrossesTerrain
Location9 MI E I278+GCP
RouteState Highway 0
Coordinates40.76803, -73.86458
Functional classUrban Principal Arterial - Other Freeway or Expressway

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck9 ExcellentNo problems noted.
Superstructure9 ExcellentNo problems noted.
Substructure9 ExcellentNo problems noted.
Last inspectionOctober 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation9: Superior to present desirable criteria
Deck geometry7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating82.9 US tons
Inventory rating63.9 US tons

Structure

MaterialSteel
DeckConcrete, cast-in-place
Main spans4
Design loadHL 93
Structure length429 ft (130.8 m)
Longest span117 ft (35.7 m)
Deck width27 ft (8.2 m)
Roadway width24 ft (7.3 m)
Vertical clearance over deck23 ft (7.1 m)

Traffic and service

Average daily traffic—
Projected traffic—
Trucks0%
Lanes on structure1
Traffic directionOne-way traffic
CarriesHighway
CrossesOther
Detour if closed0.6 mi (1 km)
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedWidening with deck rehabilitation or replacement
Estimated improvement cost$10.1 million (2024 estimate)
NavigationNo navigation control on waterway

Frequently asked questions

When was Gcp Westbound to 9 over Terrain built?

It was built in 2019, making it 6 years old in 2025.

What condition is Gcp Westbound to 9 over Terrain in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in October 2023.

How much traffic does Gcp Westbound to 9 over Terrain carry?

No traffic count is recorded for this structure.

How long is Gcp Westbound to 9 over Terrain?

The structure is 429 ft (130.8 m) long with a longest span of 117 ft (35.7 m) and a deck 27 ft wide.

Who owns Gcp Westbound to 9 over Terrain?

It is owned by the State Highway Agency.