Guy Brewer Blvd over RTE 907D RTE 907D
GoodQueens County, New York · 1.6 MI E I678 & Belt Pkwy · Structure no. 000000002231610
- Built
- 2003
- 22 years old
- Condition
- Good
- inspected July 2024
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 187 ft
- 4 main spans
- Daily traffic
- 8,415
- 2018 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
Guy Brewer Blvd over RTE 907D RTE 907D is a steel stringer/multi-beam or girder carrying Guy Brewer Blvd over RTE 907D RTE 907D in Queens County, New York. It was built in 2003, so it is 22 years old, younger than the New York average of 53 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 8,415 vehicles a day, roughly 14% of them trucks, projected to reach 16,512 by 2041. The structure is 187 ft (57 m) long and 66 ft wide. If it were closed, the detour would be 0.6 mi (1 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 8 Very Good | No problems noted. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Guy Brewer Blvd over RTE 907D RTE 907D built?
It was built in 2003, making it 22 years old in 2025.
What condition is Guy Brewer Blvd over RTE 907D RTE 907D in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in July 2024.
How much traffic does Guy Brewer Blvd over RTE 907D RTE 907D carry?
About 8,415 vehicles per day (2018 count), of which roughly 14% are trucks.
How long is Guy Brewer Blvd over RTE 907D RTE 907D?
The structure is 187 ft (57 m) long with a longest span of 65 ft (19.8 m) and a deck 66 ft wide.
Who owns Guy Brewer Blvd over RTE 907D RTE 907D?
It is owned by the City or Municipal Highway Agency.