37th ST over RTE I278 RTE I278
FairQueens County, New York · .5 MI W JCT I278 & G C Pk · Structure no. 000000002230620
- Built
- 1937
- 88 years old, rebuilt 1980
- Condition
- Fair
- inspected May 2024
- Type
- Stringer/Multi-beam or Girder
- Steel Continuous
- Length
- 100 ft
- 2 main spans
- Daily traffic
- 3,930
- 2016 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
37th ST over RTE I278 RTE I278 is a steel continuous stringer/multi-beam or girder carrying 37th ST over RTE I278 RTE I278 in Queens County, New York. It was built in 1937 and reconstructed in 1980, so it is 88 years old, older than the New York average of 53 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 3,930 vehicles a day, roughly 8% of them trucks, projected to reach 5,502 by 2036. The structure is 100 ft (30.5 m) long and 51 ft wide. If it were closed, the detour would be 0.6 mi (1 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was 37th ST over RTE I278 RTE I278 built?
It was built in 1937, making it 88 years old in 2025. It was reconstructed in 1980.
What condition is 37th ST over RTE I278 RTE I278 in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in May 2024.
How much traffic does 37th ST over RTE I278 RTE I278 carry?
About 3,930 vehicles per day (2016 count), of which roughly 8% are trucks.
How long is 37th ST over RTE I278 RTE I278?
The structure is 100 ft (30.5 m) long with a longest span of 48 ft (14.6 m) and a deck 51 ft wide.
Who owns 37th ST over RTE I278 RTE I278?
It is owned by the City or Municipal Highway Agency.