US Bridges

New Vernon Road over Metro North Railroad Por

PoorClosed to traffic

Orange County, New York · .9 Mile NW of Howells · Structure no. 000000003344900

Built
1969
56 years old, rebuilt 2001
Condition
Poor
inspected July 2024
Type
Stringer/Multi-beam or Girder
Steel
Length
198 ft
3 main spans
Daily traffic
1,498
2021 count
Owner
County
County Highway Agency

About this bridge

New Vernon Road over Metro North Railroad Por is a steel stringer/multi-beam or girder carrying New Vernon Road over Metro North Railroad Por in Orange County, New York. It was built in 1969 and reconstructed in 2001, so it is 56 years old, older than the New York average of 53 years.

The most recent inspection reported to the Federal Highway Administration rates it in poor condition with a lowest component rating of 4 out of 9. The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions. Its operating status is: closed to all traffic.

It carries about 1,498 vehicles a day, roughly 6% of them trucks, projected to reach 1,853 by 2041. The structure is 198 ft (60.4 m) long and 42 ft wide. If it were closed, the detour would be 2.5 mi (4 km).

CarriesNew Vernon Road
CrossesMetro North Railroad Por
Location.9 Mile NW of Howells
RouteCounty Highway 0
Coordinates41.48874, -74.47901
Functional classUrban Collector

Condition and inspection

Poor

The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions.

ComponentRatingMeaning
Deck4 PoorAdvanced section loss, deterioration, spalling or scour.
Superstructure4 PoorAdvanced section loss, deterioration, spalling or scour.
Substructure4 PoorAdvanced section loss, deterioration, spalling or scour.
Last inspectionJuly 2024
Inspection intervalevery 24 months
Operating statusClosed to all traffic
ScourBridge not over waterway
Structural evaluation0: Immediate repair necessary to put back in service
Deck geometry6: Equal to present minimum criteria
Approach roadway alignment7: Better than present minimum criteria
Operating rating0 US tons
Inventory rating0 US tons

Structure

MaterialSteel
DeckConcrete, cast-in-place
Main spans3
Design loadHS 20
Structure length198 ft (60.4 m)
Longest span75 ft (22.8 m)
Deck width42 ft (12.8 m)
Roadway width39 ft (11.9 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic1,498 (2021)
Projected traffic1,853 by 2041
Trucks6%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesRailroad
Detour if closed2.5 mi (4 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedWidening with deck rehabilitation or replacement
Estimated improvement cost$6 million (2024 estimate)
NavigationNot applicable (no waterway)

Frequently asked questions

When was New Vernon Road over Metro North Railroad Por built?

It was built in 1969, making it 56 years old in 2025. It was reconstructed in 2001.

What condition is New Vernon Road over Metro North Railroad Por in?

The National Bridge Inventory rates it in poor condition. The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions. The last reported inspection was in July 2024.

How much traffic does New Vernon Road over Metro North Railroad Por carry?

About 1,498 vehicles per day (2021 count), of which roughly 6% are trucks.

How long is New Vernon Road over Metro North Railroad Por?

The structure is 198 ft (60.4 m) long with a longest span of 75 ft (22.8 m) and a deck 42 ft wide.

Who owns New Vernon Road over Metro North Railroad Por?

It is owned by the County Highway Agency.