RTE 92 over Highbridge Road Limesto
FairOnondaga County, New York · 1.5 MI NW JCT SH92& SH257 · Structure no. 000000001034630
- Built
- 1999
- 26 years old
- Condition
- Fair
- inspected September 2024
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 393 ft
- 3 main spans
- Daily traffic
- 15,373
- 2020 count
- Owner
- State
- State Highway Agency
About this bridge
RTE 92 over Highbridge Road Limesto is a steel stringer/multi-beam or girder carrying RTE 92 over Highbridge Road Limesto in Onondaga County, New York. It was built in 1999, so it is 26 years old, younger than the New York average of 53 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 15,373 vehicles a day, roughly 4% of them trucks, projected to reach 15,445 by 2041. The structure is 393 ft (119.8 m) long and 59 ft wide. If it were closed, the detour would be 5 mi (8 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 8 Very Good | No problems noted. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was RTE 92 over Highbridge Road Limesto built?
It was built in 1999, making it 26 years old in 2025.
What condition is RTE 92 over Highbridge Road Limesto in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in September 2024.
How much traffic does RTE 92 over Highbridge Road Limesto carry?
About 15,373 vehicles per day (2020 count), of which roughly 4% are trucks.
How long is RTE 92 over Highbridge Road Limesto?
The structure is 393 ft (119.8 m) long with a longest span of 157 ft (48 m) and a deck 59 ft wide.
Who owns RTE 92 over Highbridge Road Limesto?
It is owned by the State Highway Agency.