RTE 5 over Mill Street Limestone C
FairOnondaga County, New York · 0.4 MI W JCT Rts 5 & 257 · Structure no. 000000001002150
- Built
- 1997
- 28 years old
- Condition
- Fair
- inspected June 2023
- Type
- Box Beam or Girders - Multiple
- Prestressed Concrete
- Length
- 236 ft
- 3 main spans
- Daily traffic
- 19,648
- 2020 count
- Owner
- State
- State Highway Agency
About this bridge
RTE 5 over Mill Street Limestone C is a prestressed concrete box beam or girders - multiple carrying RTE 5 over Mill Street Limestone C in Onondaga County, New York. It was built in 1997, so it is 28 years old, younger than the New York average of 53 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 19,648 vehicles a day, roughly 3% of them trucks, projected to reach 19,740 by 2041. The structure is 236 ft (71.9 m) long and 68 ft wide. If it were closed, the detour would be 0.6 mi (1 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was RTE 5 over Mill Street Limestone C built?
It was built in 1997, making it 28 years old in 2025.
What condition is RTE 5 over Mill Street Limestone C in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in June 2023.
How much traffic does RTE 5 over Mill Street Limestone C carry?
About 19,648 vehicles per day (2020 count), of which roughly 3% are trucks.
How long is RTE 5 over Mill Street Limestone C?
The structure is 236 ft (71.9 m) long with a longest span of 93 ft (28.3 m) and a deck 68 ft wide.
Who owns RTE 5 over Mill Street Limestone C?
It is owned by the State Highway Agency.