US Bridges

From CR137 to I81S over RTE 370 Bike Path

Fair

Onondaga County, New York · JCT of I81 & SH 57 - Ramp · Structure no. 000000001027390

Built
1987
38 years old
Condition
Fair
inspected September 2024
Type
Stringer/Multi-beam or Girder
Steel
Length
307 ft
2 main spans
Daily traffic
5,977
2020 count
Owner
State
State Highway Agency

About this bridge

From CR137 to I81S over RTE 370 Bike Path is a steel stringer/multi-beam or girder carrying From CR137 to I81S over RTE 370 Bike Path in Onondaga County, New York. It was built in 1987, so it is 38 years old, younger than the New York average of 53 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 5,977 vehicles a day, roughly 6% of them trucks, projected to reach 8,621 by 2041. The structure is 307 ft (93.6 m) long and 38 ft wide. If it were closed, the detour would be 0.6 mi (1 km).

CarriesFrom CR137 to I81S
CrossesRTE 370 Bike Path
LocationJCT of I81 & SH 57 - Ramp
RouteInterstate 0
Coordinates43.07865, -76.17781
Functional classUrban Principal Arterial - Interstate

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure6 SatisfactoryStructural elements show some minor deterioration.
Substructure7 GoodSome minor problems.
Last inspectionSeptember 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation6: Equal to present minimum criteria
Deck geometry7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating110.1 US tons
Inventory rating77.1 US tons

Structure

MaterialSteel
DeckConcrete, cast-in-place
Main spans2
Design loadHS 20
Structure length307 ft (93.6 m)
Longest span208 ft (63.3 m)
Deck width38 ft (11.5 m)
Roadway width34 ft (10.5 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic5,977 (2020)
Projected traffic8,621 by 2041
Trucks6%
Lanes on structure2
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed0.6 mi (1 km)
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkNon-Interstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedWidening with deck rehabilitation or replacement
Estimated improvement cost$4.4 million (2024 estimate)
NavigationNot applicable (no waterway)

Frequently asked questions

When was From CR137 to I81S over RTE 370 Bike Path built?

It was built in 1987, making it 38 years old in 2025.

What condition is From CR137 to I81S over RTE 370 Bike Path in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in September 2024.

How much traffic does From CR137 to I81S over RTE 370 Bike Path carry?

About 5,977 vehicles per day (2020 count), of which roughly 6% are trucks.

How long is From CR137 to I81S over RTE 370 Bike Path?

The structure is 307 ft (93.6 m) long with a longest span of 208 ft (63.3 m) and a deck 38 ft wide.

Who owns From CR137 to I81S over RTE 370 Bike Path?

It is owned by the State Highway Agency.