RTE 5 over Ny Susquehanna & Western
FairOneida County, New York · 2.3 MI S JCT SH 5 & SH 5S · Structure no. 000000001002239
- Built
- 1960
- 65 years old, rebuilt 1995
- Condition
- Fair
- inspected December 2023
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 97 ft
- 1 main span
- Daily traffic
- 38,608
- 2012 count
- Owner
- State
- State Highway Agency
About this bridge
RTE 5 over Ny Susquehanna & Western is a steel stringer/multi-beam or girder carrying RTE 5 over Ny Susquehanna & Western in Oneida County, New York. It was built in 1960 and reconstructed in 1995, so it is 65 years old, older than the New York average of 53 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 38,608 vehicles a day, roughly 9% of them trucks, projected to reach 48,182 by 2041. The structure is 97 ft (29.6 m) long and 77 ft wide. If it were closed, the detour would be 0.6 mi (1 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was RTE 5 over Ny Susquehanna & Western built?
It was built in 1960, making it 65 years old in 2025. It was reconstructed in 1995.
What condition is RTE 5 over Ny Susquehanna & Western in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in December 2023.
How much traffic does RTE 5 over Ny Susquehanna & Western carry?
About 38,608 vehicles per day (2012 count), of which roughly 9% are trucks.
How long is RTE 5 over Ny Susquehanna & Western?
The structure is 97 ft (29.6 m) long with a longest span of 84 ft (25.6 m) and a deck 77 ft wide.
Who owns RTE 5 over Ny Susquehanna & Western?
It is owned by the State Highway Agency.