US Bridges

Bus Turnaround over 95IX RTE I95

Fair

New York County, New York · 95I over Hudson River · Structure no. 00000000552250E

Built
1962
63 years old, rebuilt 2020
Condition
Fair
inspected November 2023
Type
Girder and Floorbeam System
Steel
Length
65 ft
1 main span
Daily traffic
150
2009 count
Owner
Toll Authority
Local Toll Authority

About this bridge

Bus Turnaround over 95IX RTE I95 is a steel girder and floorbeam system carrying Bus Turnaround over 95IX RTE I95 in New York County, New York. It was built in 1962 and reconstructed in 2020, so it is 63 years old, older than the New York average of 53 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 150 vehicles a day, roughly 10% of them trucks, projected to reach 210 by 2029. The structure is 65 ft (19.8 m) long and 53 ft wide. If it were closed, the detour would be 0.6 mi (1 km).

CarriesBus Turnaround
Crosses95IX RTE I95
Location95I over Hudson River
Coordinates40.84948, -73.94124
Functional classUrban Collector

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure6 SatisfactoryStructural elements show some minor deterioration.
Substructure5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Last inspectionNovember 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation5: Somewhat better than minimum adequacy to tolerate being left in place as is
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment7: Better than present minimum criteria
Operating rating43 US tons
Inventory rating26 US tons

Structure

MaterialSteel
DeckConcrete, cast-in-place
Main spans1
Design loadOther
Structure length65 ft (19.8 m)
Longest span64 ft (19.5 m)
Deck width53 ft (16.2 m)
Roadway width50 ft (15.3 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic150 (2009)
Projected traffic210 by 2029
Trucks10%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesHighway
Detour if closed0.6 mi (1 km)
TollToll bridge
National Highway SystemNo

Ownership and planned work

OwnerLocal Toll Authority
Maintained byLocal Toll Authority
Historic statusNot eligible for the National Register of Historic Places
Work proposedDeck replacement with only incidental widening
Estimated improvement cost$5.7 million (2024 estimate)
NavigationNot applicable (no waterway)

Frequently asked questions

When was Bus Turnaround over 95IX RTE I95 built?

It was built in 1962, making it 63 years old in 2025. It was reconstructed in 2020.

What condition is Bus Turnaround over 95IX RTE I95 in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in November 2023.

How much traffic does Bus Turnaround over 95IX RTE I95 carry?

About 150 vehicles per day (2009 count), of which roughly 10% are trucks.

How long is Bus Turnaround over 95IX RTE I95?

The structure is 65 ft (19.8 m) long with a longest span of 64 ft (19.5 m) and a deck 53 ft wide.

Who owns Bus Turnaround over 95IX RTE I95?

It is owned by the Local Toll Authority.