US Bridges

Winslow RD over 90IX RTE I90

Poor

Monroe County, New York · 8.8 MI E of Exit 47 90I · Structure no. 000000005510840

Built
1954
71 years old
Condition
Poor
inspected August 2024
Type
Stringer/Multi-beam or Girder
Steel
Length
260 ft
4 main spans
Daily traffic
264
2021 count
Owner
Toll Authority
State Toll Authority

About this bridge

Winslow RD over 90IX RTE I90 is a steel stringer/multi-beam or girder carrying Winslow RD over 90IX RTE I90 in Monroe County, New York. It was built in 1954, so it is 71 years old, older than the New York average of 53 years.

The most recent inspection reported to the Federal Highway Administration rates it in poor condition with a lowest component rating of 4 out of 9. The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions.

It carries about 264 vehicles a day, roughly 7% of them trucks, projected to reach 370 by 2041. The structure is 260 ft (79.2 m) long and 33 ft wide. If it were closed, the detour would be 7.5 mi (12 km).

CarriesWinslow RD
Crosses90IX RTE I90
Location8.8 MI E of Exit 47 90I
RouteCounty Highway 0
Coordinates43.02961, -77.84352
Functional classRural Local

Condition and inspection

Poor

The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions.

ComponentRatingMeaning
Deck4 PoorAdvanced section loss, deterioration, spalling or scour.
Superstructure6 SatisfactoryStructural elements show some minor deterioration.
Substructure4 PoorAdvanced section loss, deterioration, spalling or scour.
Last inspectionAugust 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation4: Meets minimum tolerable limits to be left in place as is
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Approach roadway alignment8: Equal to present desirable criteria
Operating rating54 US tons
Inventory rating25 US tons

Structure

MaterialSteel
DeckConcrete, cast-in-place
Main spans4
Design loadUnknown
Structure length260 ft (79.2 m)
Longest span82 ft (25 m)
Deck width33 ft (10.1 m)
Roadway width26 ft (7.9 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic264 (2021)
Projected traffic370 by 2041
Trucks7%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesHighway
Detour if closed7.5 mi (12 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Toll Authority
Maintained byState Toll Authority
Historic statusHistorical significance not determinable at this time
Work proposedDeck replacement with only incidental widening
Estimated improvement cost$3.5 million (2024 estimate)
NavigationNot applicable (no waterway)

Frequently asked questions

When was Winslow RD over 90IX RTE I90 built?

It was built in 1954, making it 71 years old in 2025.

What condition is Winslow RD over 90IX RTE I90 in?

The National Bridge Inventory rates it in poor condition. The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions. The last reported inspection was in August 2024.

How much traffic does Winslow RD over 90IX RTE I90 carry?

About 264 vehicles per day (2021 count), of which roughly 7% are trucks.

How long is Winslow RD over 90IX RTE I90?

The structure is 260 ft (79.2 m) long with a longest span of 82 ft (25 m) and a deck 33 ft wide.

Who owns Winslow RD over 90IX RTE I90?

It is owned by the State Toll Authority.