US Bridges

RTE I90 over Greenway Trail

Good

Monroe County, New York · 4.2 MI W of Exit 46 90IX · Structure no. 000000005510591

Built
2004
21 years old
Condition
Good
inspected September 2023
Type
Stringer/Multi-beam or Girder
Steel
Length
133 ft
1 main span
Daily traffic
13,750
2014 count
Owner
Toll Authority
State Toll Authority

About this bridge

RTE I90 over Greenway Trail is a steel stringer/multi-beam or girder carrying RTE I90 over Greenway Trail in Monroe County, New York. It was built in 2004, so it is 21 years old, younger than the New York average of 53 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 13,750 vehicles a day, roughly 18% of them trucks. The structure is 133 ft (40.5 m) long and 57 ft wide. If it were closed, the detour would be 3.7 mi (6 km).

CarriesRTE I90
CrossesGreenway Trail
Location4.2 MI W of Exit 46 90IX
RouteInterstate 90
Coordinates43.0441, -77.73248
Functional classRural Principal Arterial - Interstate

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure9 ExcellentNo problems noted.
Substructure8 Very GoodNo problems noted.
Last inspectionSeptember 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation8: Equal to present desirable criteria
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating51 US tons
Inventory rating35.7 US tons

Structure

MaterialSteel
DeckConcrete, cast-in-place
Main spans1
Design loadHS 25 or greater
Structure length133 ft (40.5 m)
Longest span131 ft (39.9 m)
Deck width57 ft (17.5 m)
Roadway width56 ft (17 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic13,750 (2014)
Projected traffic—
Trucks18%
Lanes on structure2
Traffic directionOne-way traffic
CarriesHighway
CrossesPedestrian / bicycle
Detour if closed3.7 mi (6 km)
TollOn an Interstate toll segment under Secretarial agreement
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Toll Authority
Maintained byState Toll Authority
Historic statusNot eligible for the National Register of Historic Places
Work proposedWidening with deck rehabilitation or replacement
Estimated improvement cost$3.8 million (2024 estimate)
NavigationNot applicable (no waterway)

Frequently asked questions

When was RTE I90 over Greenway Trail built?

It was built in 2004, making it 21 years old in 2025.

What condition is RTE I90 over Greenway Trail in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in September 2023.

How much traffic does RTE I90 over Greenway Trail carry?

About 13,750 vehicles per day (2014 count), of which roughly 18% are trucks.

How long is RTE I90 over Greenway Trail?

The structure is 133 ft (40.5 m) long with a longest span of 131 ft (39.9 m) and a deck 57 ft wide.

Who owns RTE I90 over Greenway Trail?

It is owned by the State Toll Authority.