RTE 31 over Subway- Abandoned
PoorMonroe County, New York · Rochester Subway Broad ST · Structure no. 000000002256060
- Built
- 1922
- 103 years old
- Condition
- Poor
- inspected December 2024
- Type
- Slab
- Concrete Continuous
- Length
- 2,733 ft
- 106 main spans
- Daily traffic
- 15,692
- 2020 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
RTE 31 over Subway- Abandoned is a concrete continuous slab carrying RTE 31 over Subway- Abandoned in Monroe County, New York. It was built in 1922, so it is 103 years old, older than the New York average of 53 years.
The most recent inspection reported to the Federal Highway Administration rates it in poor condition with a lowest component rating of 4 out of 9. The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions.
It carries about 15,692 vehicles a day, roughly 5% of them trucks, projected to reach 19,062 by 2041. The structure is 2,733 ft (833 m) long and 60 ft wide. If it were closed, the detour would be 0.6 mi (1 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 4 Poor | Advanced section loss, deterioration, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was RTE 31 over Subway- Abandoned built?
It was built in 1922, making it 103 years old in 2025.
What condition is RTE 31 over Subway- Abandoned in?
The National Bridge Inventory rates it in poor condition. The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions. The last reported inspection was in December 2024.
How much traffic does RTE 31 over Subway- Abandoned carry?
About 15,692 vehicles per day (2020 count), of which roughly 5% are trucks.
How long is RTE 31 over Subway- Abandoned?
The structure is 2,733 ft (833 m) long with a longest span of 75 ft (22.8 m) and a deck 60 ft wide.
Who owns RTE 31 over Subway- Abandoned?
It is owned by the City or Municipal Highway Agency.