US Bridges

Second Avenue over RTE 907C N Y & Atlantic

Good

Kings County, New York · At Bay Ridge · Structure no. 000000002243310

Built
2004
21 years old
Condition
Good
inspected October 2024
Type
Stringer/Multi-beam or Girder
Steel Continuous
Length
224 ft
2 main spans
Daily traffic
11,212
2011 count
Owner
City
City or Municipal Highway Agency

About this bridge

Second Avenue over RTE 907C N Y & Atlantic is a steel continuous stringer/multi-beam or girder carrying Second Avenue over RTE 907C N Y & Atlantic in Kings County, New York. It was built in 2004, so it is 21 years old, younger than the New York average of 53 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 11,212 vehicles a day, roughly 4% of them trucks, projected to reach 11,264 by 2041. The structure is 224 ft (68.3 m) long and 80 ft wide. If it were closed, the detour would be 0.6 mi (1 km).

CarriesSecond Avenue
CrossesRTE 907C N Y & Atlantic
LocationAt Bay Ridge
RouteCity Street 0
Coordinates40.64034, -74.02603
Functional classUrban Other Principal Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure8 Very GoodNo problems noted.
Substructure7 GoodSome minor problems.
Last inspectionOctober 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry6: Equal to present minimum criteria
Approach roadway alignment7: Better than present minimum criteria
Operating rating108 US tons
Inventory rating49.6 US tons

Structure

MaterialSteel Continuous
DeckConcrete, cast-in-place
Main spans2
Design loadHS 20
Structure length224 ft (68.3 m)
Longest span132 ft (40.2 m)
Deck width80 ft (24.3 m)
Roadway width54 ft (16.4 m)
Vertical clearance over deck15 ft (4.5 m)

Traffic and service

Average daily traffic11,212 (2011)
Projected traffic11,264 by 2041
Trucks4%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesHighway and railroad
Detour if closed0.6 mi (1 km)
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusHistorical significance not determinable at this time
Work proposedWidening with deck rehabilitation or replacement
Estimated improvement cost$20 million (2024 estimate)
NavigationNot applicable (no waterway)

Frequently asked questions

When was Second Avenue over RTE 907C N Y & Atlantic built?

It was built in 2004, making it 21 years old in 2025.

What condition is Second Avenue over RTE 907C N Y & Atlantic in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in October 2024.

How much traffic does Second Avenue over RTE 907C N Y & Atlantic carry?

About 11,212 vehicles per day (2011 count), of which roughly 4% are trucks.

How long is Second Avenue over RTE 907C N Y & Atlantic?

The structure is 224 ft (68.3 m) long with a longest span of 132 ft (40.2 m) and a deck 80 ft wide.

Who owns Second Avenue over RTE 907C N Y & Atlantic?

It is owned by the City or Municipal Highway Agency.