RTE 278 over RTE I278 278I 278IX2MR1
FairKings County, New York · 2.4 MI SW JCT I278 & I495 · Structure no. 000000001076460
- Built
- 1957
- 68 years old, rebuilt 2016
- Condition
- Fair
- inspected July 2023
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 49 ft
- 1 main span
- Daily traffic
- 12,615
- 2020 count
- Owner
- State
- State Highway Agency
About this bridge
RTE 278 over RTE I278 278I 278IX2MR1 is a steel stringer/multi-beam or girder carrying RTE 278 over RTE I278 278I 278IX2MR1 in Kings County, New York. It was built in 1957 and reconstructed in 2016, so it is 68 years old, older than the New York average of 53 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 12,615 vehicles a day, roughly 12% of them trucks, projected to reach 12,674 by 2041. The structure is 49 ft (14.9 m) long and 50 ft wide. If it were closed, the detour would be 0.6 mi (1 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was RTE 278 over RTE I278 278I 278IX2MR1 built?
It was built in 1957, making it 68 years old in 2025. It was reconstructed in 2016.
What condition is RTE 278 over RTE I278 278I 278IX2MR1 in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in July 2023.
How much traffic does RTE 278 over RTE I278 278I 278IX2MR1 carry?
About 12,615 vehicles per day (2020 count), of which roughly 12% are trucks.
How long is RTE 278 over RTE I278 278I 278IX2MR1?
The structure is 49 ft (14.9 m) long with a longest span of 46 ft (14 m) and a deck 50 ft wide.
Who owns RTE 278 over RTE I278 278I 278IX2MR1?
It is owned by the State Highway Agency.