US Bridges

South 3rd Street over RTE I278

Fair

Kings County, New York · 2.4 MI SW JCT I278 + I495 · Structure no. 000000001065530

Built
1957
68 years old
Condition
Fair
inspected April 2024
Type
Stringer/Multi-beam or Girder
Steel
Length
53 ft
1 main span
Daily traffic
2,998
2017 count
Owner
State
State Highway Agency

About this bridge

South 3rd Street over RTE I278 is a steel stringer/multi-beam or girder carrying South 3rd Street over RTE I278 in Kings County, New York. It was built in 1957, so it is 68 years old, older than the New York average of 53 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 2,998 vehicles a day, roughly 8% of them trucks, projected to reach 4,197 by 2037. The structure is 53 ft (16.2 m) long and 55 ft wide. If it were closed, the detour would be 0.6 mi (1 km).

CarriesSouth 3rd Street
CrossesRTE I278
Location2.4 MI SW JCT I278 + I495
RouteCity Street 0
Coordinates40.71023, -73.95624
Functional classUrban Local

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure6 SatisfactoryStructural elements show some minor deterioration.
Substructure5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Last inspectionApril 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation5: Somewhat better than minimum adequacy to tolerate being left in place as is
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Approach roadway alignment7: Better than present minimum criteria
Operating rating59 US tons
Inventory rating35.1 US tons

Structure

MaterialSteel
DeckConcrete, cast-in-place
Main spans1
Design loadHS 20
Structure length53 ft (16.2 m)
Longest span49 ft (14.9 m)
Deck width55 ft (16.8 m)
Roadway width34 ft (10.4 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic2,998 (2017)
Projected traffic4,197 by 2037
Trucks8%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesHighway
Detour if closed0.6 mi (1 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedWidening with deck rehabilitation or replacement
Estimated improvement cost$5.2 million (2024 estimate)
NavigationNot applicable (no waterway)

Frequently asked questions

When was South 3rd Street over RTE I278 built?

It was built in 1957, making it 68 years old in 2025.

What condition is South 3rd Street over RTE I278 in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in April 2024.

How much traffic does South 3rd Street over RTE I278 carry?

About 2,998 vehicles per day (2017 count), of which roughly 8% are trucks.

How long is South 3rd Street over RTE I278?

The structure is 53 ft (16.2 m) long with a longest span of 49 ft (14.9 m) and a deck 55 ft wide.

Who owns South 3rd Street over RTE I278?

It is owned by the State Highway Agency.