US Bridges

S Newstead RD over 90IX RTE I90

Good

Erie County, New York · 2.5 MI W JCT I90<ERIE Cl · Structure no. 000000005511650

Built
2015
10 years old
Condition
Good
inspected November 2023
Type
Stringer/Multi-beam or Girder
Steel Continuous
Length
201 ft
2 main spans
Daily traffic
2,216
2021 count
Owner
Toll Authority
State Toll Authority

About this bridge

S Newstead RD over 90IX RTE I90 is a steel continuous stringer/multi-beam or girder carrying S Newstead RD over 90IX RTE I90 in Erie County, New York. It was built in 2015, so it is 10 years old, younger than the New York average of 53 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 2,216 vehicles a day, roughly 4% of them trucks, projected to reach 3,102 by 2041. The structure is 201 ft (61.3 m) long and 43 ft wide. If it were closed, the detour would be 5.6 mi (9 km).

CarriesS Newstead RD
Crosses90IX RTE I90
Location2.5 MI W JCT I90<ERIE Cl
RouteCounty Highway 0
Coordinates42.97477, -78.51279
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure9 ExcellentNo problems noted.
Substructure8 Very GoodNo problems noted.
Last inspectionNovember 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation8: Equal to present desirable criteria
Deck geometry6: Equal to present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating63.1 US tons
Inventory rating38 US tons

Structure

MaterialSteel Continuous
DeckConcrete, cast-in-place
Main spans2
Design loadHL 93
Structure length201 ft (61.3 m)
Longest span98 ft (29.9 m)
Deck width43 ft (13.1 m)
Roadway width40 ft (12.2 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic2,216 (2021)
Projected traffic3,102 by 2041
Trucks4%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesHighway
Detour if closed5.6 mi (9 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Toll Authority
Maintained byState Toll Authority
Historic statusHistorical significance not determinable at this time
Work proposedWidening with deck rehabilitation or replacement
Estimated improvement cost$7 million (2024 estimate)
NavigationNot applicable (no waterway)

Frequently asked questions

When was S Newstead RD over 90IX RTE I90 built?

It was built in 2015, making it 10 years old in 2025.

What condition is S Newstead RD over 90IX RTE I90 in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in November 2023.

How much traffic does S Newstead RD over 90IX RTE I90 carry?

About 2,216 vehicles per day (2021 count), of which roughly 4% are trucks.

How long is S Newstead RD over 90IX RTE I90?

The structure is 201 ft (61.3 m) long with a longest span of 98 ft (29.9 m) and a deck 43 ft wide.

Who owns S Newstead RD over 90IX RTE I90?

It is owned by the State Toll Authority.