US Bridges

RTE I290 over Nfta - Out of Svc

Good

Erie County, New York · .8 MI E JCT SH 384 & I290 · Structure no. 000000001045012

Built
2018
7 years old
Condition
Good
inspected August 2024
Type
Stringer/Multi-beam or Girder
Steel Continuous
Length
141 ft
1 main span
Daily traffic
41,415
2019 count
Owner
State
State Highway Agency

About this bridge

RTE I290 over Nfta - Out of Svc is a steel continuous stringer/multi-beam or girder carrying RTE I290 over Nfta - Out of Svc in Erie County, New York. It was built in 2018, so it is 7 years old, younger than the New York average of 53 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 41,415 vehicles a day, roughly 7% of them trucks, projected to reach 46,413 by 2041. The structure is 141 ft (43 m) long and 53 ft wide. If it were closed, the detour would be 0.6 mi (1 km).

CarriesRTE I290
CrossesNfta - Out of Svc
Location.8 MI E JCT SH 384 & I290
RouteInterstate 290
Coordinates42.99697, -78.85849
Functional classUrban Principal Arterial - Interstate

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck9 ExcellentNo problems noted.
Superstructure9 ExcellentNo problems noted.
Substructure8 Very GoodNo problems noted.
Last inspectionAugust 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation8: Equal to present desirable criteria
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Approach roadway alignment8: Equal to present desirable criteria
Operating rating77.1 US tons
Inventory rating46 US tons

Structure

MaterialSteel Continuous
DeckConcrete, cast-in-place
Main spans1
Design loadHS 20
Structure length141 ft (43 m)
Longest span140 ft (42.7 m)
Deck width53 ft (16.2 m)
Roadway width50 ft (15.2 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic41,415 (2019)
Projected traffic46,413 by 2041
Trucks7%
Lanes on structure3
Traffic directionOne-way traffic
CarriesHighway
CrossesOther
Detour if closed0.6 mi (1 km)
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedWidening with deck rehabilitation or replacement
Estimated improvement cost$5 million (2024 estimate)
NavigationNo navigation control on waterway

Frequently asked questions

When was RTE I290 over Nfta - Out of Svc built?

It was built in 2018, making it 7 years old in 2025.

What condition is RTE I290 over Nfta - Out of Svc in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in August 2024.

How much traffic does RTE I290 over Nfta - Out of Svc carry?

About 41,415 vehicles per day (2019 count), of which roughly 7% are trucks.

How long is RTE I290 over Nfta - Out of Svc?

The structure is 141 ft (43 m) long with a longest span of 140 ft (42.7 m) and a deck 53 ft wide.

Who owns RTE I290 over Nfta - Out of Svc?

It is owned by the State Highway Agency.