RTE 9 over Pine Street
FairDutchess County, New York · 0.8 MI N JCT Rts 9+376 · Structure no. 000000001005279
- Built
- 1965
- 60 years old, rebuilt 1999
- Condition
- Fair
- inspected July 2023
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 58 ft
- 1 main span
- Daily traffic
- 37,651
- 2021 count
- Owner
- State
- State Highway Agency
About this bridge
RTE 9 over Pine Street is a steel stringer/multi-beam or girder carrying RTE 9 over Pine Street in Dutchess County, New York. It was built in 1965 and reconstructed in 1999, so it is 60 years old, older than the New York average of 53 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 37,651 vehicles a day, roughly 2% of them trucks, projected to reach 53,114 by 2041. The structure is 58 ft (17.7 m) long and 87 ft wide. If it were closed, the detour would be 5.6 mi (9 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was RTE 9 over Pine Street built?
It was built in 1965, making it 60 years old in 2025. It was reconstructed in 1999.
What condition is RTE 9 over Pine Street in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in July 2023.
How much traffic does RTE 9 over Pine Street carry?
About 37,651 vehicles per day (2021 count), of which roughly 2% are trucks.
How long is RTE 9 over Pine Street?
The structure is 58 ft (17.7 m) long with a longest span of 54 ft (16.4 m) and a deck 87 ft wide.
Who owns RTE 9 over Pine Street?
It is owned by the State Highway Agency.