US Bridges

Cheningo Solon Pon over Cheningo Creek TR

Good

Cortland County, New York · 4.6 MI SE JCT Cheningo RD · Structure no. 000000003371040

Built
2013
12 years old
Condition
Good
inspected October 2023
Type
Box Beam or Girders - Multiple
Prestressed Concrete
Length
27 ft
1 main span
Daily traffic
202
2021 count
Owner
County
County Highway Agency

About this bridge

Cheningo Solon Pon over Cheningo Creek TR is a prestressed concrete box beam or girders - multiple carrying Cheningo Solon Pon over Cheningo Creek TR in Cortland County, New York. It was built in 2013, so it is 12 years old, younger than the New York average of 53 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 202 vehicles a day, projected to reach 283 by 2041. The structure is 27 ft (8.2 m) long and 34 ft wide. If it were closed, the detour would be 6.2 mi (10 km).

CarriesCheningo Solon Pon
CrossesCheningo Creek TR
Location4.6 MI SE JCT Cheningo RD
RouteCounty Highway 0
Coordinates42.66078, -75.99749
Functional classRural Minor Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure7 GoodSome minor problems.
Channel and channel protection5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Last inspectionOctober 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry6: Equal to present minimum criteria
Waterway adequacy5: Somewhat better than minimum adequacy to tolerate being left in place as is
Approach roadway alignment6: Equal to present minimum criteria
Operating rating103 US tons
Inventory rating61.9 US tons

Structure

MaterialPrestressed Concrete
DeckNot applicable
Main spans1
Design loadHS 25 or greater
Structure length27 ft (8.2 m)
Longest span25 ft (7.6 m)
Deck width34 ft (10.5 m)
Roadway width31 ft (9.5 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic202 (2021)
Projected traffic283 by 2041
Trucks0%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed6.2 mi (10 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedWidening with deck rehabilitation or replacement
Estimated improvement cost$627,000 (2024 estimate)
NavigationNo navigation control on waterway

Frequently asked questions

When was Cheningo Solon Pon over Cheningo Creek TR built?

It was built in 2013, making it 12 years old in 2025.

What condition is Cheningo Solon Pon over Cheningo Creek TR in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in October 2023.

How much traffic does Cheningo Solon Pon over Cheningo Creek TR carry?

About 202 vehicles per day (2021 count).

How long is Cheningo Solon Pon over Cheningo Creek TR?

The structure is 27 ft (8.2 m) long with a longest span of 25 ft (7.6 m) and a deck 34 ft wide.

Who owns Cheningo Solon Pon over Cheningo Creek TR?

It is owned by the County Highway Agency.