Taylor Valley RD over E Br Cheningo Crk
FairCortland County, New York · At Cheningo · Structure no. 000000001034570
- Built
- 1934
- 91 years old
- Condition
- Fair
- inspected April 2023
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 40 ft
- 1 main span
- Daily traffic
- 99
- 2018 count
- Owner
- County
- County Highway Agency
About this bridge
Taylor Valley RD over E Br Cheningo Crk is a steel stringer/multi-beam or girder carrying Taylor Valley RD over E Br Cheningo Crk in Cortland County, New York. It was built in 1934, so it is 91 years old, older than the New York average of 53 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 99 vehicles a day, roughly 10% of them trucks, projected to reach 139 by 2038. The structure is 40 ft (12.2 m) long and 29 ft wide. If it were closed, the detour would be 1.9 mi (3 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Channel and channel protection | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Taylor Valley RD over E Br Cheningo Crk built?
It was built in 1934, making it 91 years old in 2025.
What condition is Taylor Valley RD over E Br Cheningo Crk in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in April 2023.
How much traffic does Taylor Valley RD over E Br Cheningo Crk carry?
About 99 vehicles per day (2018 count), of which roughly 10% are trucks.
How long is Taylor Valley RD over E Br Cheningo Crk?
The structure is 40 ft (12.2 m) long with a longest span of 39 ft (11.8 m) and a deck 29 ft wide.
Who owns Taylor Valley RD over E Br Cheningo Crk?
It is owned by the County Highway Agency.